Laserfiche WebLink
<br />COST ESTIMATE FOR REHABILITATION OF <br />WOODS LAKE RESERVOIR All prices are installed/placed cost u.n.o. <br /> <br />01/13/99 <br /> <br /> UNIT <br />ITEM DESCRIPTION QUANTITY UNITS PRICE AMOUNT <br /> MORlLIZATION.INSURANCE BONDS 1.00 L.S. $25,000.00 $25,000.00 <br /> OUTLET <br /> Dewatering 1.00 L.s. $15,000.00 $15,000.00 <br /> Breach excavation 10000.00 C.Y. $4.00 $40,000.00 <br /> Removal of concrete structures & irr. Pipe 1.00 L.S. $15,000.00 $15,000.00 <br /> Inlet structure concrete 50.00 c.Y. $450.00 $22,500.00 <br /> 36" gate, thimble, stem & operator 1.00 L.S. $10,000.00 $10,000.00 <br /> 24" gate, stem & operator 1.00 L.S. $7,000.00 $7,000.00 <br /> Trashracks 2.00 L.S. $500.00 $1,000.00 <br /> 36" RCP conduit 155.00 L.F. $120.00 $18,600.00 <br /> Pipe bedding 80.00 C.Y. $300.00 $24,000.00 <br /> Dissipation structure concrete 35.00 C.Y. $450.00 $15,750.00 <br /> Breach fill - w/add'l borrow from splwy excav 11000.00 C.Y. $4.00 $44,000.00 <br /> Borrow Material 1000.00 C.Y. $2.00 $2,000.00 <br /> Walkway footing 1.50 C.Y. $500.00 $750.00 <br /> Walkway steel 2850.00 Ib $1.50 $4,275.00 <br /> Handrail 1.00 L.S. $1,500.00 $1,500.00 <br /> Auxiliary gate steel 603.00 L.S. $8.00 $4,824.00 <br /> Riprap 350.00 C.Y. $40.00 $14,000.00 <br /> Riprap bedding 120.00 C.Y. $30.00 $3,600.00 <br /> Crest gravel- 4" x 15' w x 1000' 200.00 C.Y. $17.00 $3,400.00 <br /> Seeding 1.00 Acre $2,000.00 $2,000.00 <br /> $249,199.00 <br /> SPILLWAY - 450' lon~ with 6'1 side slopes <br /> Infill Existing Spillway 700.00 C.Y. $4.00 $2,800.00 <br /> Excavation 4000.00 C.Y. $4.00 $16,000.00 <br /> Cut-off wall 80.00 C.Y. $400.00 $32,000.00 <br /> Riprap -20' US & 10' DS of cutoff 850.00 C.Y. $40.00 $34,000.00 <br /> Riprap bedding 300.00 C.Y. $30.00 $9,000.00 <br /> Seeding - infill & new spwy 1.00 Acre $2,000.00 $2,000.00 <br /> $95,800.00 <br /> RAISE SADDLE DAM <br /> Fill - borrow from spillway excavation 2000.00 C.Y. $5.00 $10,000.00 <br /> Crest gravel - 4"x20'xI800' 450.00 C.Y. $17.00 $7,650.00 <br /> $17,650.00 <br /> TOE DRAINS 525.00 L.F. $25.00 $13,125.00 <br /> <br />. <br /> <br />e <br /> <br />e <br /> <br />TOTAL CONSTRUCTION COSTS $400,774.00 <br />10% CONTINGENCY $40,077.00 e <br /> <br />TOTAL COST $440,851.00 I <br />