Laserfiche WebLink
<br />... ..,}; <br />.~~tlP.' <br />l'~t,~~r <br /> <br />the hems of work have increased significantly. The cost of rip rap has increased nearly 60%. the cost of <br />the gates. operators, and the concrete pipe have increased approximately 25 % since the coses estimaees <br />were conducted. The cost to complete basic taSks such as earthwork excavation and fill have increased <br />on the order of 100% since 1996. The 10% contingency fee utilized in the srody was noe adequaee co <br />address this type of increase in costs. <br /> <br />..",. <br />r;;!.- ~~:. <br /> <br />Due to the unforseen problems noted, the project cost has changed significantly. Due to this, ehe Woods <br />Lake Mutual Water and Irrigation Company requests the CWCB Board increase the loan amoune by <br />5270,000. <br /> <br />If you have any questions. please contact Mr. Rtlben Hergert, President of Woods lake or Duane Smith <br />of Smith GeoteChnical. <br /> <br />,,"';"::.t;.;. <br /> <br />Prepared by. <br />SMlTII GEOTECHNICAL <br /> <br />Reviewed and Approved by. <br />Woods Lake Mutual Water & Irrigation Company <br /> <br /> <br />(jf~ I!~ <br /> <br />Ruben Hergen. President <br /> <br />w/attacbments <br /> <br />Woods Lake D4Ill <br /> <br />Page 4 <br /> <br />:... <br /> <br />e <br /> <br />e <br /> <br />e <br />