My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02626
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02626
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:36 PM
Creation date
10/4/2006 7:18:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Changes in Existing Loans - Woods Lake Mutual Water and Irrigation Company - Woods Lake Dam Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />~>It" <br />!:~ii';:i'I" <br />'j.' <br /> <br />e <br /> <br />~h...-i . <br /> <br />e <br /> <br />e <br /> <br />WOODS LAKE MUTUAL WATER & IRRIGATION COMPANY <br />12315 Weld County Road 72 <br />Eaton, Colorado 801515 <br /> <br />January 12, 1999 <br />Project No. 96.013 <br /> <br />Mr. Mike Serlet, P.E. <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />Dear Mr. Serlet: <br /> <br />The design of the Woods Lake Dam Rehabilitation has been completed by our engineer. Smith <br />Geotechnical. We have revised the estimated cost to complete the work as follows. <br /> <br />Estimated Construction Costs <br />10% Contingency <br />Engineering/Surveying <br />New Irrigation Pump Structure <br />TOTAL <br /> <br />$ 400,774 <br />$ 40,077 <br />$ 55,000 <br />$ 53.970 <br />$ 549,821 <br /> <br />See the aaaehed table for a breakdown of the estimated construction costs. The revised construction costs <br />are due to changes required by the State Engineer that were unknown when the project started and due to <br />relocation of the spillway. The revised engineering and surveying costs are based on changes to date due <br />to revisions required to the spillway and outlet works and additional surveying due to relocation of the <br />spillway, The "New Irrigation Pump Strucmre" is to relocate the current irrigation pump suucmre located <br />in the dam to a location removed from the dam at the request of the State Engineer. A more detailed <br />explanation of the changes is summarized later in this letter. <br /> <br />A summary of the costs as outlined in the "Feasibility Study" dated January 24, 1997 and the current cost <br />projections is as follows. <br /> <br />SUMMARY OF PROJECT COSTS <br /> <br /> '" .,.. . . <br />Item .'. . ... .IMtiiilcOsll!stlDWe Current Cost Estimate <br /> . Janu. 1997 Januarv 1999 <br />Estimated Construction Cost $194,000 $454,744 <br />Engineering/Surveying $ 36.000 $ 55,000 <br />Contingency $ 20,000 $ 40,077 <br />TOTAL $250.000 $549.821 <br /> <br />woods Lake Dam <br /> <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.