Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sh...rDldI1 SIn'd, Room 721 <br />IJtonv~'r,Col'lr.lJllHO'2ln <br />Phone: (103)1'066-3-1-\\ <br />FAX: (303)866-+174 <br />www.cwCb.~t..Jtl'.cO_U~ <br /> <br /> <br />MEMORANDUM <br /> <br />BillO......11-~ <br />UW"Jll('or <br /> <br />To: Colorado Water Conservation Board Members <br /> <br />Rus....1l Gt'llTg" <br />E:u'CUtlVt"Oill'Ctllr <br /> <br />From: Dan Merriman and Linda Bassi <br />Stream and Lake Protection Section <br /> <br />Ro..l Kuh.Jrich <br />CWCB DlTl.'Ctor <br /> <br />Date: November 4. 2005 <br /> <br />Rid. Brown <br />AclingDt>puty <br />Dil1'Ctvr <br /> <br />Rc: A~enda No. 19. Nonmber 15~16. 2005 Board Meeting: E!\IJ SqU3"" Pass. LtC; <br />(Case No. 1-0~C\V32J) - Injur~' with !\litigation Proposal <br /> <br />This agenda item addresses a proposed pretrial resolution under ISF Rule 8i. (3) (Injury <br />Accepted with Mitigation). This is the first meeting of the two-meeting process required by Rule <br />8i,(3), <br /> <br />Backefound <br />In Case No, I,04CW323. EMJ Squaw Pass. LLC ('"EMf') has applied for a plan for <br />augmentation and conditional appropriative right of exchange to rcpll.lce depictions from <br />sno,...,naking and domestic water uses at Echo Mountain. a winter skiing and snowboard park <br />located within the Warren Gulch watershed. tributary to Clear Creek. approximately 4.0 miles <br />south of Idaho Springs. (See vicinity map attached hereto). EMJ plans to open the park in latc <br />Dccember 2005 or early 2006. Water supplies for Echo l\1ountain will originate from a series of <br />ground water wells and two on-site ponds totaling 5.5 acre fect (AF) in capacity. The ponds will <br />be filled by the wells and will operate together to provide the necessary snowmaking and <br />domestic water supply. Under the plan for augmentation. EMJ proposes to utilize a combination <br />of trans basin \vater (Vidler Tunnel), non-tributary water (Henderson Mine) and both on-site and <br />off-site storage to replace expected stream depletions. In addition to thc plan for augmentation, <br />EMJ has requested the State Engineer to approve a temporary Substitute Water Supply Plan <br />(SWSP) for the 2005/2006 operations, <br /> <br />The CWCB liIcd a statement of opposition to the above-refercnced water court application due <br />to potential injury to instream flow water rights in the area. The ISF water rights that could be <br />impacted by these applications are listed below: <br /> <br />Col(lr.lJll W,lh'rCofl.-"ot'rvallon Bo.\.uJ <br />Flo,...! PWf,...:tKm . \\".lh,'r Supply Pl.d.nning .md FII'l.l.ncl.' . Stn"dm.md Ldk... Prol..'Cti.....n <br />W.lIn Suppl)" Pn>t..'Ctil.m . COf\..,.,rv.llll."n.rnd Drought PLmmng <br />