Laserfiche WebLink
<br />, <br /> <br />Agenda Item 9a(i) <br />Case No. 5-95CW348; Upper Eagle Regional Water Authority <br /> <br />e <br /> <br />Case Summary <br /> <br />The Board ratified the Statement of Opposition filed in this case at its May 13-14, 1996, meeting. <br />This is an application for approval of plan for augmentation, including exchange, on the East Fork <br />Eagle River and Eagle River near Climax in Eagle and Summit Counties (see attached map). <br />Applicant proposes to augment out-of-priority storage in Eagle Park Reservoir with releases of water <br />stored in Green Mountain Reservoir, historic irrigation consumptive use credits, and snowmaking <br />return flows. Applicant seeks a May 18, 1993, exchange date in connection with the plan for <br />augmentation. <br /> <br />The Board holds the following instream flow decrees on the Eagle River and East Fork Eagle River: <br /> <br /> Case No. Stream Amount (cfs) Approp. Date <br /> 85CW262 East Fork Eagle River 1.5 5/3/85 <br /> 85CW263 East Fork Eagle River 2.0 5/3/85 <br /> 78W3805 Eagle River 12/6 5/12/78 <br /> 78W3811 Eagle River 15/8 5/12/78 <br /> 78W3788 Eagle River 25/11 5/12/78 <br /> 78W3796 Eagle River 50/20 5/12/78 <br />e 80CW134 Eagle River 85/35 3/1 7/80 <br />80CWI26 Eagle River 110/45 3/17/80 <br />80CWI24 Eagle River 130/50 3/17/80 <br /> Stipulation <br /> <br />Applicant has agreed to the following terms and conditions which will provide full protection for the <br />Board's instream flow water rights on the Eagle River and East Fork Eagle River. <br /> <br />. The plan for exchange shall be administered under a May 18, 1993, priority date, and <br />shall only be operated under, and to the extent that, the exchange is in priority, <br /> <br />. For purposes of determining the amount of water in the East Fork Eagle River to <br />administer the plan for exchange as it relates to the instream flow of the CWCB <br />decreed in Case No. 85CW262, the point of measurement shall be located on the East <br />Fork Eagle River within 500 feet downstream of the East Fork Pumping Plant. <br /> <br />. So as to assure the proper operation of the subject plan for augmentation and <br />exchange, the Applicants will install and maintain such measuring devices and <br />implement such accounting procedures as may be required by the State of Division <br />Engineers to.....administer the terms of this decree. <br /> <br />e <br /> <br />A:1595CW348.STP <br />