Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866.4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />OariesC. Lile, P.E. <br />Director, ewes <br /> <br />Peter H. Evans <br />Acting Director, ewes <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />John Van Sciver <br /> <br />DATE: <br /> <br />May 4, 1998 <br /> <br />SUBJECT: <br /> <br />Agenda Item 23c.. May 11-12, 1998, Board Meeting-- <br />Marketing Update on Future Prospects for 1998...(Informationalltem) <br /> <br />Table (1): Applications Received in 1998, to Date <br />Table (2): Additional Prospects for 1998 <br /> <br />TABLE (1) APiPlICA TIONS RECEIVED IN 1998. TO DATE <br />BORROWER PROJECT DESCRIPTION AMOUNT <br />Boulder and Left Hand Rehabilitate Twin Lakes outlet, and replace drop $50K <br />Irrigation Co. structures on the ditch. $62.5K total project <br />(Boulder Co.) cost, <br />Small Project Loan Approved 3/10/98. <br />Columbine Ranches Purchase water rights to augment an existing $100K <br />POA irrigation well, and rehabilitate the well pump <br />(Adams Co,) and motor. $250K total project cost. <br />Small Project Loan Scheduled for consideration May 12, 1998, <br />Farmers Pawnee Canal Rehabilitate diversion structure and headgate on $29K <br />(Morgan Co,) the South Platte River, $11 OK total project cost. <br />Small Project Loan Approved 3/10/98. <br />Groundwater . Construct new 2,200 acre-foot reservoir to $1.7M <br />Appropriators of the augment the South Platte River. $1.7 million <br />South Platte total project. (HB-1189) <br />(Sedgwick Co,) Approved 3/11/98. Included in HB 98-1189. <br />Western Mutual Ditch Rehabilitate diversion structure on the South $100K <br />Co. Platte River. $217K total project. <br />(Weld Co.) Scheduled for consideration 5/11/98. <br />Small Project Loan <br />Total Amount of Applications Received in 1998, to Date........ $1.98M <br />