My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02519
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:44 PM
Creation date
10/4/2006 7:16:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/24/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br /> <br />County: Weld- W of Eaton <br />Project Yield: 3,106 ad!. <br />Project Type: Dam Rehabilitation <br /> <br />, <br />e <br /> <br />Wood Lake Mutual Water & Irrigation Companv - Wood Lake Dam Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Cache la Poudre River <br />Terms ofLoan: $188,000@3,75%for30years <br /> <br />This project is the replacement of the Wood Lake Dam outlet works including all control <br />structures, installation of a toe drain, raising the existing saddle dam, and construction of a spillway <br />to pass the 50% Probable Maximum Precipitation flood, The need for the improvements is a result <br />of the State Engineer's Office dam safety requirements, Smith Geotechnical, Inc. of Fort Collins <br />commenced design in late spring 1998, Construction is scheduled for the fall of 1999, <br /> <br />Rvan Gulch Reservoir Companv - Rvan Gulch Dam Rehabilitation <br /> <br />Authorization: SB 99-173 <br />Water Source: Big Thompson River <br />Terms of Loan: $317,500 @4.25%for30years <br /> <br />County: Larimer - S, of Loveland <br />Project Yield: 645 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />e <br /> <br />This project is the rehabilitation of the Ryan Gulch Dam which includes the construction of <br />a new spillway, lining the upstream face of the dam with a clay liner, sleeving the existing 24-inch <br />outlet pipe, and constructing a new upstream controlled inlet works. Boyle Engineering, Inc, of <br />Denver has been contracted to complete the project design, which is scheduled for construction for <br />the fall of 1999, <br /> <br />Riverside Reservoir and Land Companv - Riverside Reservoir Spillwav Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: South Platte River <br />Terms of Loan: $450,000 @ 3,75% for 20 yrs. <br /> <br />County: Weld-NW of Wiggins <br />Project Yield: 200 ac.ft, <br />Project Type: Spillway Rehabilitation <br /> <br />This project is the construction of an emergency spillway on the Riverside Reservoir Dam, <br />located 11 miles northwest of Wiggins in Weld County, The State Engineer has placed a storage <br />restriction on the reservoir until an emergency spillway is completed, The Riverside Reservoir and _ <br />Land Company contracted with W,W, Wheeler and Associates of Denver to prepare construction ., <br />plans and specifications. The State Engineer's office is currently reviewing the plans with <br />construction scheduled to commence and be completed in late 1999, <br />
The URL can be used to link to this page
Your browser does not support the video tag.