My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02519
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:44 PM
Creation date
10/4/2006 7:16:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/24/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />Authorization: SB 98-1189 <br />Water Source: San Luis Valley Aquifers <br />Terms of Loan: $2,000,000 Grant <br /> <br />County: Alamosa - W of Alamosa <br />Project Yield: N/A <br />Project Type: Aquatic Species Hatchery <br /> <br />( <br />e <br /> <br />DNR - Division of Wildlife - Native Aauatic Species Restoration Facilitv <br /> <br />This project is the construction of a Native Aquatic Species Restoration Facility just west of <br />Alamosa, The project is being managed and 60% funded by the Division of Wildlife, FishPro,lnc, <br />of Port Orchard, Washington is currently preparing construction plans and specifications, <br />Construction is scheduled to commence in June 1999 with completion scheduled for June 2000, <br /> <br />Consolidated Mutual Water Companv - Fortune Reservoir Dam Construction <br /> <br />Authorization: SB 99-173 <br />Water Source: Clear Creek <br />Terms of Loan: $10,000,000@4,75%for 10 years <br /> <br />County: Jefferson - NW of Arvada <br />Project Yield: 8,869 ad!. <br />Project Type: New Dam Construction <br /> <br />This project is the construction of a new 9,000 acre-foot reservoir northwest of Arvada, e <br />The project consists of a 105-foot high, zoned earth embankment, Probable Maximwn Flood <br />emergency spillway, with a 30-inch diameter outlet pipe, The Company has contracted with Tuttle- <br />Applegate, Inc, of Denver to prepare the final design drawings and construction contract <br />docwnents, The plans are currently being reviewed by the State Engineer's Office and construction <br />is scheduled to commence in the fall of 1999, <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.