<br />The Greeley and Loveland ImgalJon Comp.vly (GUC), and 'IS sister company the Seven Lakes
<br />Irrigahon Company (SUC), own and operate a system ollllSefV~rs and canals in the Loveland and
<br />Greeley area, with about 52% Of water in munICipal use and 480/0 agricultural. GUC owns Boyd
<br />lake WhlCh has a surface areaoll,750acre8, c.lpOlcily of 4S,874 acre feet, height of 40 f....land
<br />creSllenglh of 10,729 feet, The dam is a Class 1 em~ankmenl dam. Previous stlKlleS ident,fJed
<br />possible need for improvements 10 the Boyd lake spiHway, and poss,bly the Horseshoe Lake
<br />spillway, liS bOltl resel'llOlrs basically operate togefher as a syslem Tne currenl sp,llway is a natural
<br />swal<!l, Iocaled near the pump !'lOuSe in the east SIde of the dam emoankfNlfll, .....,th <11'1 appro~lIT\ate
<br />spillway w1(ltll of 20 feef II lsaballdoned and 1$ 1'10 longer operable or capable of conveying any
<br />storm f\ows TN! SEO r@Quires that Class I dams conta'n spillways capable of safely passing 75%
<br />of the Probable Ma~,mum Pf~ip,tation (PMP) storm event Even if operable, the e~isl,ng spillway
<br />could only safely pass appro~imately 16% of the PMP event. The GUC is applying for a $2,844,000
<br />Small Project Loan 10 provide a new spillway for BoyQ Lake S<le-Specllic PMP stud,es have shown
<br />a need for sp,llway Improvements 00 Boyd Lake only. The seleded altematr.<e eonSISlS of a
<br />comb,nal,on ollabyr1ntll spdlway with a width of a~tl,l00 leel and ar'l eff~llve welf length of
<br />5,720 leel, feplacing 1,100 feet of canal lining downstream of the SPillway; al'ld COI'lIlNding a 350
<br />IoogflOOdwall 10 prevenl water from enteflng Inlo twO strudureS during fIoodevenl:s,
<br />T~r:'~ .r
<br />\ ,/ (_~:__: j;\ ." '~f~
<br />, .
<br />: 1: =b',
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />
<br />G.......,.n<lU>o.'_~!>Q.IbOOCQmoacy.Oloyol<l'~S".'Iw"'
<br />_b,,~,g..~12001
<br />
<br />Water Project Construction Loan Program-Project Data
<br />
<br />Bo"ower: Greeley and Lo~ela"d IrrigatIOn Co. COUrlty Larimer
<br />Project Name: Boyd Lake Spillway Project Type: Spillway Reconslruction
<br />Drainagll Basirl: Soufh Plalte Water Source: Big ThompSOOl RIver
<br />
<br />Total Project Cost: $3.160,000 Funding Sources: CWCB, GllC
<br />
<br />Type of Borrower: Agncultur.:lVMuniopal Aller, Delivery: 37,812 acre-f<<et
<br />
<br />cwes Small Project Loan: $2,844.000
<br />
<br />Imerest Rate: 300%
<br />
<br />Teml:30years
<br />
<br />
<br />~___u_.
<br />{
<br />
<br />."
<br />,
<br />
<br />",
<br />,,"_a..
<br />
<br />,
<br />,
<br />,
<br />, .
<br />~ ' '
<br />.....,
<br />"
<br />
<br />,
<br />
<br />'"
<br />
<br />".,.
<br />
<br />" - - ..-..;.1..
<br />'-V..,_...
<br />
<br />localonMap
<br />
<br />P"9~6of6
<br />
<br />--~
<br />
<br />I
<br />I
<br />
<br />;s
<br />,~
<br />, ..
<br />
|