My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02510
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:38 PM
Creation date
10/4/2006 7:16:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/20/2002
Description
CF Section - Financial Matters - Reversal of Residual Project Funds
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX, (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />Mike Serlet, P.E., Chief, <br />Water Supply Planning and Finance Section <br /> <br />DATE: <br /> <br />May 13,2002 <br /> <br />SUBJECT: <br /> <br />Agenda Item #10b. - May 20-21,2002, Board Meeting <br />Water Supply Planning and Finance Section - Financial Matters <br />Reversal of Residual Project Funds <br /> <br />Introduction <br /> <br />When a project from the Construction Fund is completed, de-authorized, or amended, <br />residual or unused funds sometime remain in the project account. These encumbered project funds <br />must be un-encumbered or reversed back into the unreserved cash balance of the Construction Fund <br />by the Department of Natural Resources (DNR) Controller's Office or they cannot be used for other <br />purposes. <br /> <br />Background <br /> <br />The attached list of project loans, feasibility studies, grants and non-reimbursable projects <br />have been completed with residual or unused funds remaining from the original appropriated <br />amounts. These funds have remained encumbered by the DNR Controller and consequently have <br />not been made available for new water project loans or grants. <br /> <br />Discussion <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.