Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />DRAFT <br /> <br />streams and lakes to be studied for inclusion in the IFNL system <br />before those streams and lakes are actually studied. This will <br />save staff time if certain areas are not feasible for considera- <br />tion for inclusion in the IFNL system. <br /> <br />All Board proposed actions are included on meeting agendas made <br />available to the public prior to CWCB meetings including those <br />actions concerning the IFNL program. In order to highlight pos- <br />sible IFNL actions to persons in the vicinity of the appropria- <br />tion, the Board has designated additional persons to receive <br />extra notice. The staff will consult with the Division Engineer <br />to help identify all persons that may have a special interest in <br />a CWCB IFNL action. Because the notice provided in ~ 5.21 is in <br />addition to regular public notice of Board actions, failure to <br />notify an interested person will not affect the validity of the <br />Board action or subsequent water' court case. <br /> <br />147 <br /> <br />148 <br />149 <br /> <br />152 <br />153 <br />154 <br />155 <br />156 <br />157 <br />158 <br />159 <br />160 <br />161 <br /> <br />The required board findings set forth in 5.30-5.33 are repeated 164 <br />verbatim from ~ 37-91-102(3)(c), C.R.S. (1990). Finding 5.31 165 <br />satisfies statutory requirements within the context of the IFNL 166 <br />program but should not be understood as providing complete pro- 168 <br />tection to the environment in and of itself. <br /> <br />-5- 3 <br />