My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02500
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:31 PM
Creation date
10/4/2006 7:16:39 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/16/2004
Description
CF Section - Small Project Loan De-authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~ <br /> <br />-2- <br /> <br />recommend that the Board extend the project time limit for one year. The staff will . <br />continue to review the project on an arulUal basis until a CWCB funding contract is fully <br />executed or the Board has recommended de-authorization to the Legislature. <br /> <br />Since these projects are all Small Project Loans, that is less than $5,000,000, and were <br />authorized by the Board, the Board also has the authority to de-authorize them. <br /> <br />Discussion <br /> <br />As of November of this year, there are no authorizations for funding that are three years or <br />more past the date of authorization and are not yet under contract. There is one project that is not <br />past the three-year deadline, however the project sponsors are no longer interested in moving <br />forward with a loan from the CWCB. Staffhas evaluated each of the authorizations and discussed the <br />status of the projects with the project sponsors and their consultants. The results of these evaluations <br />along with the staff recommendations relative to extending proj ect time limits are summarized in the <br />following: <br /> <br />a. Johnson and Edwards Ditch Companv - Recharge and Augmentation Proiect - The CWCB <br />approved a Construction Fund project loan of $132,500 to the Company in 2003 for the <br />construction of2 recharge ponds, drilling one recharge well, constructing a pipeline between <br />the well and the ditch, and purchasing a share of reservoir water. The Company has since <br />changed their recharge plan and has requested de-authorization of this loan (attached letter). <br />Staff recommends that the Board consider de-authorization of this loan. . <br /> <br />Recommendation <br /> <br />Staff recommends the Board approve de-authorization of the loan authorizations, as <br />described above, and as shown in the attached spreadsheet. <br /> <br />. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.