My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02492
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:25 PM
Creation date
10/4/2006 7:16:30 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2005
Description
Status of Legislation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8 <br />9 <br />10 <br />II <br />12 <br />13 <br />14 <br />15 <br />16 <br /> <br />. In-stream flow engineering support services; <br />. C:nntinnatinn nfthe South Platte decision support system; <br />. Continuation of the document imaging system and <br />integrated water information center; <br />. Continuation of the Colorado floodplain map <br />modernization; <br />. Continuation of the weather modification program; <br />. Enhanced snowpack assessment program; <br />. Continuation of the flood hazard mitigation program; <br />. Floodplain technical services; <br />. Republican river water conservation district operations; <br />. Oak creek reservoir feasibility study; <br />. Arkansas valley drainage study; <br />. Continuation of the statewide water supply initiative; and <br />. Conservation reserve enhancement program. <br />Restores the balance in the flood response fund to $150,000. <br /> <br />1 Be it enacted by the General Assembly of the State of Colorado: <br />2 SECTION 1. Water project loan authorizations from the. <br /> <br />3 <br /> <br />severance tax trust fund perpetual base account. (1) Pursuant to <br /> <br />4 section 39-29-109 (1) (a) (1), Colorado Revised Statutes, the Colorado <br />5 water conservation board is hereby authorized to loan moneys from the <br />6 severance tax trust fund perpetual base account to enable the construction <br />7 of the following water resources projects with the following priority: <br /> <br />Priority <br /> <br />Loan Amount <br /> <br />(a) <br /> <br />Borrower-Project <br />Central Colorado Water Conservancy <br />District Well Augmentation Sub-district <br />Water Rights Purchase and Construction of <br /> <br />Lined Gravel Pit Water Storage* - <br /> <br />$ 20.200.000 <br />$ 20,200,000 <br /> <br />Total <br /> <br />*This loan is to refmance projects wholly or partially completed. <br />(2) The Colorado water conservation board may make loans for <br />the construction of the project specified in subsection (I) of this section <br /> <br />-2- <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />084 <br />
The URL can be used to link to this page
Your browser does not support the video tag.