My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02480
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:04 PM
Creation date
10/4/2006 7:15:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
ISF Section - New Appropriations - Notice to Appropriate Instream Flow Water Rights in Water Division 2
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />NATURAL ENVIRONMENT SURVEY <br /> <br />Survey Date: 10130/86 <br /> <br />"~1 <br />~ <br /> <br />BLM land in S34 T17S R70W 6PM <br />250' electrofished. Sample included: 9 brown trout (4"-13"); 14 white sucker (2"- a <br />16"), 1 flathead chuh, 9 longnose dace and 4 longnose suckers. ,., <br />brown trout fishery <br /> <br />Survey Location: <br />Survey Summary: <br /> <br />Basis for ISF: <br /> <br />FIELD SURVEY <br /> <br />Survey Date: 4/17/96 <br /> <br />Method Used: R2X I <br />Measured Flow (cfs): 14 <br />Survey Location: SW SW 834 T17S R70W 6PM <br />Notes: BLM LAND - Original reach divided into 2 segments. <br /> <br />Grassline Width (ft): 23.9 <br />PHOTOS: 3 <br /> <br />WATER AVAILABILITY <br /> <br />Method: <br /> <br />fil <br />u. 15 <br />o <br />~ <br /> <br />~ <br />..J <br />U. <br />~ 10 <br />J: <br />~ <br />o <br />::;: <br />~ 5 <br />::;: <br /> <br />The Fourmile Creek hydrograph was derived using data from the steam gage on Fourmile Creek <br />below Cripple Creek (ID #07096250). See hydrograph below. The summer instream flow <br />recommendation was reduced to 7.5 cfs (7/1-7/31) based on the water availability analysis_ As <br />per the Division 2 Engineer, senior water rights do not present a water availability problem <br />within this reach of stream_ <br /> <br />OCT NOV DEC <br />9,1 7.9 6.0 <br /> <br />MEDIAN MONTHLY FLOWS cfs <br />JAN FEB MAR APR MAY]UN <br />6,7 6.2 8.1 19. 55. 49. <br /> <br />AUG SEP <br />15. 13. <br /> <br />JUL <br />13. <br /> <br />. Fourmile Creek below Cripple Creek near Victor <br />1992-94 <br /> <br />20 <br /> <br /> <br />---- <br /> <br /> <br />----- <br /> <br /> <br />...-------....--- <br /> <br />o <br /> <br />OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT <br />MONTH <br /> <br />1_ CWCS !SF AMOLNT I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.