My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02479
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:03 PM
Creation date
10/4/2006 7:15:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
CF Section - Four Seasons Trout Farm Fish Hatchery Rehabilitation Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br /> <br />JohnjEan Sciver, P.E. ~./~ <br />Mike Serlet, P.E., Chief U <br />Water Supply Planning an Finance Section. <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />TO: <br /> <br />. <br /> <br />March 12, 2002 <br /> <br />SUBJECT: Agenda Item 11., March 21-22, 2002 Board Meeting <br />Four Seasons Trout Farm <br />Fish Hatchery Rehabilitation Project <br /> <br />DATE: <br /> <br />Introduction <br />The Four Seasons Trout Farm (FSTF) is applying for an $85,500 Small Project loan to rehabilitate <br />the fish hatchery. The total cost of the project is $97,945. This request is for a CWCS loan to <br />rehabilitate a fish hatchery and eliminate whirling disease in accordance with HS 01-1024 <br />(Concerning Financial Incentives for Commercial Fish Hatcheries that test Positive for Whirling <br />Disease.) Please see the attached project summary and map. <br /> <br />Backqround <br />The FSTF, 10C<lted in Delta County, operates the Four Seasons Trout Farm Fish H<ltchery, a <br />commercial fish operation. The hatchery is located in Cedaredge and was constructed in about <br />1925. The hatchery recently tested positive for whirling disease. <br /> <br />John Niblack purchased the hatchery in 1986 to run as a business. In 2000 the hatchery tested <br />positive for whirling disease. Mr. Niblack hired McMillon Engineering to design improvements. <br /> <br />FSTF needs to complete the rehabilitation work as soon as possible, in order to get the hatchery <br />certified negative for whirling disease and resume business, a process that requires approximateiy <br />14 months. It would be a hardship for the FSTf to delay rehabilitation work until 2003. The FSTF <br />is therefore eligible for a Small Project Loan from the Construction Fund. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.