My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02473
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:57 PM
Creation date
10/4/2006 7:15:46 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/26/2001
Description
Joint Water Quality Meeting Follow-Up
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />166 <br /> <br />October 9 2001' 1:15 p.m. <br /> <br />Triennial review il1formational hearing to consider the possible need for revisions to the Regulation <br />Controlling Disch~rges to Storm Sewers, Regulation #65 ( 5 CCR 1002-65). Any actual revisions would <br />be considered in ~ sUbsequent rulemaking hearing. <br /> <br />October9 2001' 1:30 p.m. <br /> <br />Annual informati< nal hearing to receive pUblic comment on water pollution problems within the State. <br />, <br /> <br />LAMAR <br />November 13.2001: 9:00 a.m. <br /> <br />Triennial review informational hearing to consider possible revisions to the Classifications and <br />Standards for the Arkansas and Rio Grande Basins, Regulations #32 and #36 (5 CCR 1002-32, 5 CCR <br />1002-36). Any actual revisions would be considered in a subsequent rulemaking hearing.. <br /> <br />November 13. 2001: 1:30 p.m. <br /> <br />Rulemaking hearing to consider revisions proposed by Cripple Creek & Victor Gold Mining Company to <br />the pH Standards for Arequa Gulch in the Arkansas River Basin, Regulation #32 (5 CCR 1002-32). <br /> <br />December 10.2001: 9:00 a.m. <br /> <br />Rulemaking hearing to consider possible adoption of site-specific ground water quality standards at the <br />Microsemi site, as proposed by Siemens Mircroelectronics, Inc., FMC Corporation, Mircosemi _ <br />Colorado, and Coors Tek, in Regulation #42 (5 CCR 1002-42). <br /> <br />Januarv 14. 2002: 1:00 p.m. <br /> <br />Routine review informational hearing to consider the pOSSible need for revisions to the Colorado <br />Discharge Permit System Regulatiol)s, Regulation #61 (5 CCR 1002-61). Any actual revisions would <br />be considered in a subsequent rulemaking hearing. <br /> <br />Januarv 14.2002: 1:30 p.m. <br /> <br />Informational hearing to consider approval of the 2002 seetlon 305(b) report regarding the status of <br />water quality in Colorado. <br /> <br />Februarv 11. 2002: 9:00 a.m. <br /> <br />Rufemaking hearing to consider a proposal by the U.S. Army for revisions to the DIMP Standards, in the <br />Basic Standards and Methodologies for Surface Water and the Basic Standards for Ground Water, <br />Regulations #31,41 (5 C;CR 1002-31, 5 CCR 1002-41). <br /> <br />Februal)' 11.2002: 1:0Q.p.m. <br /> <br />Triennial review informational hearing to consider the possible need for revisions to the Upper Colorado <br />River Basin and Lower Colorado River Water Quality Classification and Standards, Regulation #33 and <br />#37 (5 CCR 1002-33 and 37). Any actual revisions would be considered in a subsequent rulemaking <br />hearing. . <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.