My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02469
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:56 PM
Creation date
10/4/2006 7:15:44 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/18/2005
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />In their June final inflow forecast, the National Weather Service is forecasting 9.0 million <br />acre-feet of unregulated inflow to Lake Powell this April through July, which is 113 <br />percent of average. The water surface elevation of Lake Powell is projected to increase <br />through mid-July. Current projections show Lake Powell reaching a peak water surface <br />elevation in July 2005 of about 3,607 feet, which will be about 51 percent of capacity. It <br />is important to note that there is still some uncertainty with these projections as weather <br />conditions fluctuate. <br /> <br />Drought Loosens Grip On Flows In The Green River Below Flaming Gorge Dam: <br />Reclamation reported that wetter spring snowpack and runoff conditions returned this <br />year to the Green River Basin in northeast Utah and northwest Colorado following <br />several years of drought. Flows in the Green River near Jensen, Utah, peaked at 19,600 <br />cubic-feet-per-second (cfs) on May 26, and remained high through early June due largely <br />to higher than expected unregulated flows out of the Yampa Ri veL <br /> <br />Earlier this year, Reclamation, a partner with the Upper Colorado River Endangered Fish <br />Recovery Program, worked cooperatively to arrange to provide additional releases from <br />Flaming Gorge Dam, if needed during spring runoff, to support requested Green River <br />target flows near Jensen. Target flows of 14,000, 16,000 and 18,000 cfs were established <br />according to requirements of planned research studies that had been postponed because of <br />years of drought. <br /> <br />This small change in dam operations did not result in an unusual spring peak or <br />unexpected levels of water entering the floodplain. Since 1962, peak flows at Jensen of <br />18,000 cfs or greater occurred 24 out of 44 years, or 55% of the time. During the peak <br />flow this year, more than 75% of the volume of flow in the Green River near Jensen was <br />from the Yampa River and not from Flaming Gorge Dam. <br /> <br />Reclamation June 2005 Update on Fontenelle: Fontenelle Reservoir is currently <br />releasing 6000 cfs and the elevation is approximately 6494 feet above sea level (12 feet <br />below the spillway crest). Releases will remain high during the months of June and July. <br />Inflows are averaging nearly 7000 cfs over the past 10 days and the reservoir elevation <br />has been increasing. <br /> <br />Open forum discussions on Fontenelle operations take place at the "Fontenelle Reservoir <br />Working Group" meetings. The Working Group is a forum for information exchange <br />between Reclamation and other parties associated with the operation of Fontenelle <br />Reservoir. The next Working Group meeting is scheduled for August 18, 2005 and will <br />be held in Seedskadee National Wildlife Refuge. The meeting will begin at 10:00 am. For <br />more information about the Fontenelle Working Group, contact Ed Vidmar at 801-379- <br />1182. <br /> <br />Colorado River Salinity Forum Work Group to Hold August Work Group Meeting: A <br />Work Group meeting has been called for August 30-31 in Salt Lake City. <br /> <br />Wyoming Water Development Commission Considering Pipeline: The Wyoming <br />Water Development Commission is examining the feasibility of building a pipeline to <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.