Laserfiche WebLink
<br />. (paragraph 23): Applicant shall install measuring devices, provide accounting and supply . <br />calculations regarding the timing of depletions as required by the Division Engineer for the <br />operation of this change of water rights. <br /> <br />. <br /> <br />. <br />