My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02456
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:36 PM
Creation date
10/4/2006 7:15:20 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
CF Section - Changes to Existing Loans - Lower Arkansas Water Management Association - Loan Payment Deferral Request
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~, <br /> <br />1-, <br /> <br />j <br /> <br />POLICY NUMBER: 10 <br /> <br />LOAN PAYMENT DEFERMENT REQUESTS FROM THE <br />CONSTRUCTION FUND AND SEVERANCE TAX TRUST <br />FUND PERPETUAL nASE ACCOUNT <br /> <br />e <br /> <br />SUBJECT: <br /> <br />EFFECTIVE DATE: November 24, 1997 <br /> <br />POLICY: <br /> <br />Under the statutory authority of Section 37-60-120 (3) CRS, the <br />Colorado Water Conservation Board (CWCB) may, at its <br />discretion, consider a request for defennent of payment on an <br />existing loan from eith\lr the CWCB Construction Fund or the <br />Severance Tax Trust Fund Perpetual Base Account. Any request <br />for defennent of paymel1t on an existing loan will require either: <br />(1) the borrower to pay interest for the period in which the loan <br />payment is deferred or (2) calculation of a new loan amortization <br />schedule that provides for adding to the principal of the loan the <br />interest that accrues during the period in which the loan payment is <br />deferred. . <br /> <br />PURPOSE: <br /> <br />This policy allows the Board to maintain the financial integrity of <br />the Construction Fund and the Severance Tax Trust Fund Perpetual <br />Base Account while providing project sponsors an opportunity to <br />recover from periods of financial difficulties, drought, flood, or <br />other hardship beyond their controL <br /> <br />e <br /> <br />APPLICABILITY: This policy and procedure apply to all loans from the CWCB <br />Construction Fund and Severance Tax Trust Fund Perpetual Base <br />Account. <br /> <br />PROCEDURE: Upon request for deferral of an annual loan payment, staff will <br />prepare a memorandum for presentation at the next regularly <br />scheduled Board meetiqg. The memo will include the reason(s) <br />for the deferral request, i the original loan and project infonnation, <br />loan re-payment history; and a staff recommendation including, if <br />applicable, a revised 10aA repayment schedule. <br /> <br />Approved by the CWCB <br />November 24,1997 Board Meeting <br />Agenda Item #15a <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.