My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02446
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:33 PM
Creation date
10/4/2006 7:15:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/26/1999
Description
WSP Section - Colorado River Basin Issues - 15-Mile Reach ESA Section 7 Consultation - Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />. <br /> <br />. <br /> <br />in recognition ofthe large annual variations that normally occur due to precipitation, evaporation, <br />storage and other variables. New depletions will receive somewhat less protection from future <br />regulatory review than "existing" supplies since the water interests asked the FWS to review new <br />depletions in any future effort to reestablish compliance with ESA before reviewing: existing: <br />depletions. <br /> <br />When the 10-year average of new depletions reaches 50,000 AF (or in 2015, whichever <br />occurs first), the FWS says it will review implementation ofthe recovery actions and the status of <br />the endangered species. If the FWS determines that the recovery actions have not been <br />implemented or that the species' status has not improved "sufficiently," it plans to reinitiate this <br />consultation. The FWS will determine whether additional measures must be required and whether <br />the Recovery Program is able to implement those measures before depletions are allowed to <br />exceed 60,000 AF, However, the measures being discussed now are generally expected to <br />provide the basis for full development of the entire 120,000 AF. <br /> <br />The Recovery Action Requirements. Tbe set of recovery actions contemplated by the <br />FWS in these discussions includes flow protection measures, other habitat restoration and <br />protection measures, stocking measures and continued monitoring, research and funding <br />measures, The flow-related measures do not include new water rights in Colorado; instead, they <br />include <br />. the two existing rights the CWCB holds in the I5-Mile Reach, <br />. the existing "5.000 + 5,000 AF" requirement from Ruedi Reservoir, <br />. a new requirement for a lease(s) of IO,825 AF for 15 years from Ruedi, <br />. another requirement for a permanent IO,825 AF from any Division 5 facility(s), <br />. the Coordinated Reservoir Operations Study ("CROS") that have enhanced the spring peak <br />by approximately 2,000 - 2500 AF last year and the year before, and <br />. the Coordinated Facilities Operation Study (a.k.a. "CROS U")that is supposed to work <br />toward a goal of20,000 AF without impairing project yield or increasing operating cost. <br /> <br />The non-flow recovery actions are likely to include: <br />. development and maintenance of grow-out ponds; <br />. restoration of bottom lands; <br />. passage facilities at the Roller Dam and Price-Stubb diversions; <br />. stocking endangered fish; <br />. restricting the stocking of non-native competitors and the removal of any associated harvest <br />restrictions; and <br />. developing a comprehensive non-native fish control plan for the Colorado River. <br /> <br />The Flow Recommendations. The FWS has tried to clariJY its view that "recovery" (we <br />are still working to define this term) will require protection of "adequate flows," but not <br />necessarily the recommended flows. The FWS recognizes that the 1995 flow recommendations <br />will not be met for the spring months but, in its consideration of the PBO, they explicitly <br />anticipate that "the combination of flow and non-flow recovery actions will increase populations <br />of endangered fishes and restore critical habitat." FWS will use fish population response, which <br />may take many years to detect reliably, to indicate whether the recovery goals are attained. If <br />they are not, the FWS says it will reinitiate consultation and plans to ask each federal agency <br /> <br />Flood Control and Floodplain Management -Larry Lang, Chief. Water Project Planning and Construction- Mike Serler, Chief. Instream <br />Flows and Water Rights Investigations-Dan Merriman, Chief. Interstate Streams Investigations-Randy Seaholm, Chief. Office of <br />Conservation Planning-William Stanton, Chief. Personnel and Budget .Susan Maul, Chief <br />
The URL can be used to link to this page
Your browser does not support the video tag.