My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02439
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:27 PM
Creation date
10/4/2006 7:15:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/11/1998
Description
CF Section - Changes in Existing Loans - Hawkeye Lateral Ditch Company - Hawkeye Lateral Ditch Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />tit <br /> <br />e <br /> <br />-- <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Shennan Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />8 <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br />James S. lochheild <br />Executive Director, ONR <br />DclriesC. Ule, RE. <br />Director, eWeB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members iJ <br /> <br />Bill Stanton, P.E., Chief, Project Planning and Construction Section ~; , ' <br />Mike Serlet, P.E., Project Manage~S <br /> <br />May 4, 1998 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />Agenda Item # I5.a., May 11-12, 1998, Board Meeting - Water <br />Project Construction Loan Program - Changes in Existing Loans - <br />Hawkeye Lateral Ditch Company - Hawkeye Lateral Ditch Rehab. <br /> <br />BACKGROUND <br /> <br />A $143,000 loan to the Hawkeye Lateral Ditch Company (HLDC) was approved <br />in 1997 through SB 97-008 for the rehabilitation of the Hawkeye Lateral Ditch located in <br />Mesa County, north of Fruita. The terms of the loan were not to exceed 75% of the total <br />project cost of $490,000 at an interest rate of 3.75% repayable over 30 years. The Grand <br />Junction office of the Natural Resource Conservation Service (NRCS) designed the <br />project and a construction contract was awarded to M. A. Concrete Construction, Inc. of <br />Grand Junction in November 1997. The project includes the construction of <br />approximately 11,750 linear feet of concrete and PVC pipeline replacing an existing open <br />concrete ditch in poor condition. Project docwnentation and final accounting is currently <br />underway with substantial completion scheduled for May 1998. <br /> <br />The docwnentation of the constructed project has resulted in an adjustment of <br />several bid quantities. The final tabulation of bid quantities increases the total project cost <br />by $11,112.75. The HLDC has requested an increase to their loan in the amount of <br />$11,112.75 for a total loan amount of$154,112.75. <br />
The URL can be used to link to this page
Your browser does not support the video tag.