Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />1. <br /> <br />Type of funding <br />a. loan <br />b. grant/non-reimbursable <br />Type of project (structural or non structural) <br />a. development of compact entitlement <br />b. dam rehabilitation <br />c. infrastructure construction or rehabilitation <br />d. satellite monitoring system <br />e. water management activities and studies (including <br />feasibility studies) <br />f. floodplain management <br />Estimated annual yield in acre-feet for water supply <br />projects or damages avoided for floodplain projects <br />Cost effectiveness of the project* <br />Project sponsor <br />a. agricultural <br />b. municipal low income <br />c. municipal middle income <br />d. municipal high income <br />e. commercial/industrial <br /> <br />2. <br /> <br />3. <br /> <br />4. <br />5. <br /> <br />*For water supply projects cost effectiveness will be rneasured in <br />terms of cost per acre-foot of water developed or supplied. For <br />floodplain management projects, cost effectiveness will be based <br />on the damages avoided as a result of the project. <br /> <br />The Policy Statement was adopted at the November 24,1997 Board meeting. <br />The Procedure ueeds Board approval. <br />