My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02432
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:21 PM
Creation date
10/4/2006 7:15:02 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
ISF Section - Water Acquisition Program - City of Aspen
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />- <br /> <br />e <br /> <br />-- <br /> <br />extraordinary drought or emergency conditions in its municipal water supply. <br /> <br />11. The Board hereby authorizes Aspen to be its agent for administration and <br />monitoring of its irtstream flow right on Castle Creek. <br /> <br />12. As the Board's agent, Aspen shall be responsible for monitoring streamflows in <br />Castle Creek at the Midland Flume, for operating the stream model described in paragraph 17 <br />to determine when the Board's irtstream flow right is in priority in Castle Creek above and <br />below the Midland Flume, and for calibrating Or refining such stream model from time to time. <br />If measurement or model results indicate that the Board's decreed irtstream flow is in priority, <br />but that there is not enough water physically available to fulfIll the decree (without including the <br />Aspen bypasses), then Aspen shall contact the water commissioner or Division Engineer on the <br />Board's behalf, and call for curtailment of junior water rights to make water available for the <br />decreed irtstream flow. Aspen shall immediately report to the Board any time a call is made. <br /> <br />13. The Board recognizes that Aspen has agreed to bypass portions of its own water <br />rights to assist the Board's instream flow program as described herein in reliance on the ability <br />of the Division Engineer, Water Division No.5, and water commissioner to atimini~ter Castle <br />Creek and its tributaries. Should the Division Engineer be unable to reasonably atimini~ter water <br />rights on Castle Creek and its tributaries to protect the irtstream flow, Aspen may refuse to <br />bypass water hereunder and, at its election, may terminate this Agreement. <br /> <br />14. Aspen shall be responsible for maintaining all records necessary for the <br />implementation of this Agreement, using forms mutually agreeable to the pa.'"ties, and all records <br />of streamflows at the Midland Flume, and diversions by Aspen's water rights, as reasonably <br />required by the Division Engineer for administration of water rights (including the irtstream <br />flow) in Castle Creek. <br /> <br />15. Aspen will provide an annual report to the Board on the operation of this <br />Agreement, the actions taken by it as the Board's agent, and its planned operations for the <br />upcoming year. The report shall be provided by January 1 of each year and shall address the <br />previous year's activities. <br /> <br />16. Upon thirty (30) days advance written notice to Aspen, the Board may, in its sole <br />discretion, revoke this authorization for Aspen to act as its agent; provided, however, that if the <br />Board revokes this authorization, then it must assume at its own expense all responsibility for <br />the administration and monitoring that would be undertaken by Aspen in order to implement this <br />Agreement. If the Board fails to do so, Aspen may terminate this Agreement. <br /> <br />17. The parties agree to cooperate in the design and implementation of a <br />comprehensive stream measurement system on Castle Creek and development of a reliable model <br />of Castle Creek that will enable real-time administration of Castle Creek. The operational model <br />will be developed and calibrated to enable the parties to predict when the Board's decreed <br />irtstream flow is in or out of priority in reaches both upstream and downstream of the Midland <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.