My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02425
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:20 PM
Creation date
10/4/2006 7:15:00 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
10/31/1957
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />829 <br /> <br />I <br /> <br />4. Participatinq Proiects. <br /> <br />Dec. 17, 1949 - The following projects were recom- <br />mended by the Colorado Water Conser- <br />vation Board to the Bureau of Recla- <br />mation for inclusion as participating <br />projects in the Upper Colorado River <br />Storag~ Project: <br /> <br />(1) Paonia Project, (2) Smith Fork <br />Project, (3) Silt Project, (4) Pine <br />River Extension, (5) Florida Project, <br />(6) two units of the La Plata Project <br />on the La Plata River to serve land <br />in Colorado and New Mexico, and (7) <br />the Little Snake Project (Savery-Pot <br />Hook Project). Feasibility reports <br />on the last two were not available in <br />time for the inclusion in Public Law <br />485. <br /> <br />5. Colorado ~fuin Stem and Gunnison Basins. <br /> <br />Dec. 13, 1954 - The Colorado Water Conservation Board <br />recomm~nded: <br /> <br />a. Cliffs Divide studies. West Divide <br />to have first priority. Parshall, <br />Eagle and Woody units to have equal <br />priorities. <br /> <br />b. Gunnison Project. Fruitland Mesa to <br />have first priority. Bostwick Park, <br />Dallas Creek, Ohio Creek and Grand <br />Mesa (exclusive of pumping division) <br />to have equal priorities. <br /> <br />Note: West Divide and Fruitland Mesa <br />were given first priority in a <br />resolution of the Colorado River <br />Water Conservation District meet- <br />ing of June 17th. <br /> <br />I <br /> <br />.6. <br /> <br />San Juan Basin. <br /> <br />May, 1954 <br /> <br />- Dolores. Project; status report rendered. <br /> <br />Apr. 19, 1955 - Animas-La Plata approved by Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.