My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02415
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:18 PM
Creation date
10/4/2006 7:14:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/20/2000
Description
Directors' Reports
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Loveland. City of - Green Ridge Glade Reservoir Rehabilitation <br /> <br />Authorization: HB 98-1189 <br />Water Source: Big Thompson River <br />Terms of Loan: $5,000,000@4.75% for 10 yrs. <br /> <br />County: Larimer - W. of Loveland <br />Project Yield: 6,000 acre feet <br />Project Type: Dam enlargement <br /> <br />This $19.2 million project is the enlargement of the Green Ridge Glade Reservoir northwest of <br />Loveland. The project consists of raising the crest of the existing dam approximately 60 feet, <br />construction of a new concrete labyrinth weir spillway, and new multi-level intake gate tower outlet <br />structure. The City has contracted with Woodward-Clyde of Denver to prepare the final design and <br />construction contract documents. Environmental studies are currently underway with construction <br />scheduled to commence in late 2001 or early 2002. <br /> <br />'" <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.