Laserfiche WebLink
<br />the required 60-day review period, which has been extended to April 17th. Public hearings were <br />held on February 15, 16, and 17 in Durango, Farmington and Denver respectively. <br /> <br />A Record of Decision on the SEIS is expected in June, 2000. <br /> <br />Navajo Dam Re-operation EIS: The re-operation of Navajo Dam to meet the San Juan <br />Recovery Program flow recommendations is critical to both the recovery program and our ability <br />to move forward with the Animas-La Plata Project. The final flow recommendations are <br />contained in a May, 1999 report. The EIS will evaluate the impacts ofre-operating Navajo Dam <br />to meet those flow recommendations. Staff wrote to Reclamation in Decemberl999 identifying <br />issues that need to be addressed in the EIS. <br /> <br />Yampa and White River Basin <br /> <br />Yampa Water Management Planning: The planning group held a video conference on <br />Feb. 11 to discuss the status of Wyoming's efforts to develop information about its future Green <br />and Bear river depletions. This information is expected to be available in July. The group also <br />discussed non-native fish control concerns, water availability issues and the signing of an MOU <br />implementing the plan between the USFWS and the states upon which a Programmatic <br />Biological Opinion would be based. <br /> <br />As a result ofthe discussions a water contingency and an MOU drafting subcommittee were <br />formed. The water subcommittee met on Mar. 9 and will meet again on April 4. The full group <br />is planning to meet again on May 2 in Steamboat Springs. The group plans to schedule a larger <br />public meeting early this summer. <br /> <br />. <br /> <br />Agency Budget . <br /> <br />FY 2000-2001 Figure Setting: The CWCB's Fiscal Year 00-02 budget request was set <br />by the Joint Budget Committee on February 20, 2000. The approved budget includes a 2.7% <br />increase, or $74,585 over the FY 99-00 base appropriation of$2.7 million and 32.0 FTE. This <br />requested increase included the $5,350 amended increase for Interstate Compact Dues and <br />$69,245 in other increases. Notable activities in this year's figure setting exercise included a 1 % <br />reduction from the FY 99-00 base, a $10,690 PERA reduction and a reduction of $2369 for in- <br />state and out-of-state travel reduced from the Operating base. The CRDSS line list $906 in the <br />travel reduction initiative, and the Water Conservation Program lost $671. Initially, there was <br />also an action to remove the 1.0 FTE and $61,535 from the Platte River Basin Cooperative <br />Agreement. Fortunately, we were able to submit adequate justification for the need for these <br />funds in a comeback action, and Senator Lacy offered an amendment to restore the funding in <br />committee on Friday, March 10th. The agency has filed another comeback to request the <br />replacement of any funds deleted from FY 99 travel, but have riot received a decision as of this <br />writing. <br /> <br />### <br /> <br />14 <br /> <br />. <br />