My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02385
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:01 PM
Creation date
10/4/2006 7:14:37 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
ISF Section - Statements of Opposition - Case No. 5-99CW240, Horseback, Inc./Roaring River Ranch, LLC
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br /> <br />) <br /> <br />Consent Agenda Item 4-1.f <br />Case No. 5-99CW240; Horseback, Inc./Roaring River Ranch, LLC <br /> <br />Application Summary <br /> <br />This is an application for a plan for augmentation, change of water rights, exchange and surface and <br />storage water rights on the Roaring Fork River in Pitkin County near the town of Aspen (see <br />attached map). The Applicant is proposing to augment depletions associated with the evaporation <br />of the Kinder Ponds Nos. 1, 2, and 3 and the inigation of 0.5 acres with releases from Ruedi <br />Reservoir. The Ponds have an appropriation date of June 15, 1996 for aesthetic, piscatorial and fIre <br />protection uses and will be filled using the Kinder Pump and Pipeline (0.27 cfs). In addition, the <br />Applicant is requesting that the Kinder Pump and pipeline be an alternate point of diversion for 0.27 <br />cfs associated with the Pine Grove Pipeline. <br /> <br />CWCB Appropriations <br /> <br />The Board holds an instream flow right on the Roaring Fork River for 55 cfs during the summer <br />(April I to September 30) and 30 cfs during the winter (October 1 to March 31) with an <br />appropriation date of November 8, 1985, which could be injured by this application. <br /> <br />Potential for Iniury <br /> <br />) <br /> <br />The Applicants' proposed plan for augmentation may not replace depletions to the Board's instream <br />flow water rights on the Roaring Fork River in the same time, amount and location as they have <br />historically occurred. In addition, the Applicant's proposed upstream change of water rights may <br />deplete the Board's instream flow water rights on the Roaring Fork River. <br /> <br />Other Obiectors <br />There are no other objectors in this case. <br /> <br />L:\BOARDMEMVan 2000\consent agenda_ 4-1(doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.