My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02369
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:50 PM
Creation date
10/4/2006 7:14:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/24/2003
Description
WSP Section - SWSI Implementation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />. Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX, (303) 866-4474 <br />www.cwcb.state.cQ.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />MEMORANDUM <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />To: <br /> <br />Colorado Water Conservation Board <br /> <br />Rod Kuharich, Director 6<15 ~ f7rK <br />Rick Br{)wn, Project M=ager, Interstate Stream Prote~ <br /> <br />March 26, 2003 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Prom: <br /> <br />Date: <br /> <br />Subject: <br /> <br />Agenda Item 23, March 24-26, 2003 Board Meeting, <br />Statewide Water Supply Initiative (SWSI) Implementation Update <br /> <br />.. <br /> <br />This agenda item is intended to update the CWCB on the implementation ofthe SWSI. Over the last <br />month CWCB staff and management have meet several times with the selected Consultant, Camp <br />Dresser & McKee, and one of their subcontractors, GBSM to develop a scope of work. We have <br />completed a Draft general scope of work which is attached for your review. We have also meet with <br />the Board's Steering Committee (a.k.a technical committee) and we are currently in the process of <br />developing a detailed scope of work. <br /> <br />Given the importance of the project, and our desire to begin work as soon as funds might be <br />available (late April or Early June) we are requesting that the Board approve the Draft general scope <br />in concept, and authorize staff and the Board's Steering Committee to finalize a scope of work. <br />Upon completion of a final scope of work we would then enter into formal contract negotiations, and <br />provided that the terms are acceptable,. execute a contract for the work once funds become available. <br /> <br />,. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.