Laserfiche WebLink
<br />,i <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />. <br /> <br />Borrower: Little Thompson Water District <br /> <br />County: Larimer <br /> <br />Project Name: Dry Creek Reservoir <br /> <br />Project Type: New Reservoir <br /> <br />Drainage Basin: South Platte <br /> <br />Water Source: CBT <br /> <br />Total Project Cost: $21,600,000 <br /> <br />Funding Sources: CWCB, L TWO, CWCWD <br /> <br />Type of Borrower: Municipal (Middle/High) <br /> <br />Aver. Delivery: 8,850 acre-feet <br /> <br />CWCB STTFPBA Fund Loan: $4,945,500 <br /> <br />Interest Rate: 3.60% <br /> <br />Term: 20 years <br /> <br />. <br /> <br />The Little Thompson Water District (L TWO) and Central Weld County Water District (CWCWD) are <br />each applying for a CWCB loan to construct a new water storage reservoir in a 50/50 partnership. <br />Both districts would jointly build, own and operate the proposed reservoir. This loan is in addition to a <br />previous loan for a smaller 5200 acre-feet reservoir for $3,937,500, approved in November 2002. <br />L TWO and CWCWD jointly own the Carter Lake Filter Plant that treats Colorado-Big Thompson (C-BT) <br />water. Currently, the filter plant has no raw water storage facility. All water treated by the plant is <br />delivered directly from Carter Lake to the filter plant through the St. Vrain Supply Canal. Consequently, <br />the Districts are entirely dependent on availability of water from Carter Lake. In wet years, the Districts <br />are unabie to treat and store all of the water to which they are entitled. In dry years, the Districts can <br />have a shortage of water and are forced to meet their demands with water from outside entities. In <br />addition, any condition that would interrupt supply from Carter Lake such as maintenance to Carter <br />Lake or the St. Vrain Supply Canal also would cause interruption in operation of the treatment plant. <br />The proposed project, located 2-3 miles southeast of Carter Lake, would include construction of an <br />approximately 8,850 acre-foot reservoir, including a 55-foot high, 4,820-foot long earthen dam with <br />emergency spillway and outlet works, construction of a 6,300 GPM pump station, and approx. 6500 If <br />of new 24"ductile iron line to connect to the existing 20" line at the NW corner of the reservoir leading to <br />the Filter Plant. The reservoir will also gravity fill through this pipeline. <br /> <br />Carter <br />Lake <br /> <br /> <br />I'" <br /> <br /> <br />l.' Milliker <br /> <br />n <br /> <br />4 <br /> <br />Of11PBof1 <br /> <br />I" <br /> <br />_d_Springs 1'1'''' <br />----_._,_._~-----.--- -.-- <br /> <br />~ Lyons <br /> <br />.J' , <br /> <br />/ <br /> <br /> <br />4 <br /> <br />M <br /> <br /> <br />. <br /> <br />. <br /> <br />Hygien <br /> <br />'" <br />Location Map <br /> <br />I" <br />\' <br />