My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02344
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:44 PM
Creation date
10/4/2006 7:14:09 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
Summary Minutes and Record of Decisions - January 12-13, 1998
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FPR 97-456. The motion was seconded by Allen Davey <br />and approved unanimously (8-0). <br /> <br />4b. Floodplain Management South Platte River Channel Project <br />Right of Way Request. <br />Tape 1, Start/Stop: 2474 - 2650 <br />Action: An error was found in the text: the word "not" is <br />to be added to the last line on page 1 of the Board <br />memo. A motion was made by Allen Davey that the <br />Board approve the easement for Ron D. Koch and Mark <br />A. Small as shown in the corrected Board memo. The <br />motion was seconded by Janice Sheftel and approved <br />unanimously (8-0). <br /> <br />4c. Floodplain Management Statewide River Rehabilitation and <br />Floodplain Management Needs Inventory. <br />Tape 1, Start/Stop: 2650 - 4677 <br />Action: A motion was made by Janice Sheftel that the Board <br />accept the findings of the report, and authorize <br />the Director to communicate with the legislature to <br />figure out if there is a way to initiate a bill for <br />a revolving loan program. The motion was seconded <br />by Ray Werner. The motion was then amended to <br />accept the report with some revisions: to modify <br />the Executive Summary to make it clearer, and that <br />the phrase "stakeholder-driven" be modified to <br />"locally initiated." The modified motion was then <br />approved unanimously (9-0). <br /> <br />5. Office of Water Conservation - Approval of Conservation Plans <br />Tape 1, Start/Stop: 4677 - 4757 <br />Action: It was determined that, since it is relatively easy <br />for staff to determine whether the plans have <br />followed all requirements, there is no need for the <br />Board to take action. <br /> <br />6a. Water Project Construction Loan Program - Changes in Existing <br />Projects Beaver Reservoir Company Beaver Reservoir Dam <br />Rehabilitation. <br />Tape 1, Start/Stop: 4757 - 5320 <br />Action: A motion was made by Ray Werner to accept the <br />staff recommendation to defer this interest during <br />construction payment until November 1, 1998 (and <br />included with the first annual loan payment), but <br />that the deferment was conditional on the Beaver <br />Reservoir Company raising their assessment as <br />indicated in the Board memo for this item. The <br />motion was seconded by Allen Davey and approved <br />unanimously (8-0). <br /> <br />Minutes January 28-29, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.