My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02340
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02340
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:42 PM
Creation date
10/4/2006 7:14:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
1999 Colorado Legislative Activities - HB 99-1050 - Process and Funding for Development of Water Projects
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />· The added requirement to address "new or adjustments to existing, instream . <br />flow water rights that assist in meeting existing and reasonably foreseeable <br />environmental and other nonconsumptive water needs" in the Boards' <br />comments on the local planning work (page 5, line 26); <br /> <br />· The incorporation of a "needs test" with respect to future transbasin diversions <br />(page 7, lines 22-26); and <br /> <br />· The emphasis on water quality (page 4 line 18) and the reference to federal <br />law (page 5 line 23). <br /> <br />The DNR submitted a fiscal analysis of this proposal based upon <br />discussions between Hal Simpson and myself. Our estimate is that each agency <br />may need one new employee for each year and that the total cost for fiscal year <br />1999-2000 will be approximately $228,000. For FY 2000-2001, we estimate a <br />budget of $452,000. We derived these estimates based on the assumptions that <br />there would be approximately 12 local basin planning groups and that each would <br />need to meet approximately 6 times per year. We contemplate hiring a local <br />consultant (potentially, one for each local group) to facilitate these meetings and a <br />consultant in year 2 for the integration of these local planning group products <br />(approximately 2,000 hours of assistance) into a single report to the Colorado <br />General Assembly. Although it isn't clear from the attached bill, Representative <br />Smith is proposing that these costs would be funded from the CWCB's 5% annual <br />share of the Severance Tax Operational Account funds. <br /> <br />If this bill is approved, we will want to structure our participation very <br />carefully, so that: <br />· the planning efforts primarily reflect local interests, not state agency <br />proposals) and <br />· the State Engineer's regulatory responsibilities are not compromised as <br />the planning efforts mature into proposed projects and mitigation <br />measures we can advocate. <br /> <br />Representative Smith has clearly indicated that he wants the CWCB to <br />have "lots of latitude" in the establishment of the local basin planning groups, but <br />the extent to which they may require financial and technical assistance is still <br />unclear. Some expect that these local planning group efforts will be highly <br />technical, requiring extensive engineering support, while others expect these <br />efforts will be conducted at a "reconnaissance level," that will not require much <br />assistance beyond access to and evaluation of existing information. <br /> <br />This is appears to be the single piece of legislation in the 1999 session that <br />could have the greatest impact on CWCB responsibilities and workload priorities. <br />Therefore, I will invite Representative Smith and Senator Dennis to attend and <br />participate in our discussion on January 28th. <br /> <br />Attachments <br />cc: Representative Smith, Senator Dennis, Water Steering Committee <br /> <br />L:/boardmemlJan99/19c <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.