My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02328
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:39 PM
Creation date
10/4/2006 7:14:03 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2005
Description
ISF Section - Uncontested Streams Final Action Required
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Availabilitv Studies <br />The CWCB Staff has conducted an evaluation of water availability for these streams. To <br />determine the amount of water physica1\y available for the Board's appropriations, Staff <br />analyzed available USGS gage records, available streamflow models, and/or utilized <br />appropriate standard methods to develop a hydro graph of mean or median monthly flows <br />for each recommendation. Staff also relied upon the flow measurements made as part of <br />the field survey as an indicator of the amount of water physically available in each <br />stream. Staff also analyzed the water rights tabulation for each stream and consulted with <br />the Division Engineer's Office to identify any potential water availability problems. <br />Based upon its analysis, Staff has determined that water is available for appropriation on <br />each stream to preserve the natural environment to a reasonable degree without limiting <br />or foreclosing the exercise of va lid existing rights. <br /> <br />Amendments to the Instream Plow Recommendations <br />As mentioned above, Staff consults with the Division Engineers to discuss water <br />availability for each proposed instream flow appropriation. The instream flow <br />recommendations that were presented to the Board at the January 2005 meeting were <br />based upon meetings with the Water Division 4 Engineer's Office in October 2004. <br />Since this time, the Division Engineer has contacted Staff and recommended <br />modifications to the recommendations for several of the streams located on the <br />Uncompahgre Plateau. Specifically, the Division Engineer suggested that a shorter <br />runoff period was more typical for the fo1\owing streams: Dry Creek, East Pork Dry <br />Creek, West Pork Dry Creek, Escalante Creek, East Fork Escalante Creek and Middle <br />Pork Escalante Creek. The CWCB, BLM and the USPS Staffs agree that these <br />modifications will more accurately reflect the hydrologic conditions for these particular <br />streams. The attached table provides a list of the streams with the modified flow amounts <br />and/or time periods. <br /> <br />RELEVANT INSTREAM FLOW RULES <br />Por each stream listed in the attached list of instream flow recommendations, the staff <br />recommends that the Board proceed as provided in Instream Plow Rules 5f., 5h. and 5i.: <br /> <br />5f. Date of Appropriation. The Board may select an appropriation date that may be no <br />earlier than the date the Board declares its intent to appropriate. The Board may declare <br />its intent to appropriate when it concludes that it has received sufficient information that <br />reasonably supports the findings required in Rule 5i. <br /> <br />5h. Pinal Board Action on an ISP Recommendation. The Board may take final action on <br />any uncontested Staff Recommendation(s) at the May Board meeting or any Board <br />meeting thereafter. If a Notice to Contest has been filed, the Board sha1\ proceed under <br />Rule 5j-5q. <br /> <br />5i. Required Findings. Before initiating a water right filing to confirm its appropriation, <br />the Board must make the fo1\owing determinations: <br /> <br />... <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.