Laserfiche WebLink
<br />Action, <br /> <br />This was an informational item; no action taken, <br /> <br />21d, Colorado River Basin Issues - Colorado River (Mainstem) Director's Report <br />Tape 5, Start/Stop, 0000 - 0000 <br />Action, This item was deferred; pertinent information was discussed in later items in <br />section 21. <br /> <br />21e, Colorado River Basin Issues - Upper Colorado River Commissioner's Report <br />Tape 5, Start/Stop, 0000 - 0000 <br />Action, This item was not addressed, <br /> <br />21f. Colorado River Basin Issues - Glen Canyon Adaptive Management Program - Status <br />Report <br />Tape 5 Start/Stop, 0014 - 0231 <br />Action, This was an informational item; no action taken, <br /> <br />(note" ,due to a typographic error on the agenda, there was no item 21g or h) <br /> <br />2li, Colorado River Basin Issues - Animas-La Plata Project - Status Report <br />Tape 5, Start/Stop, 0231 - 0458 <br />Action, This was an informational item; no action taken, <br /> <br />21j, Colorado River Basin Issues - 15-Mile Reach ESA Section 7 Consultation - Status <br />Report <br />Tape 5, Start/Stop, 0458 - 1566 <br />Action, This was an informational item; no action taken, <br /> <br />21k. Colorado River Basin Issues - Endangered Fish Recovery, Instream Flow Water <br />Rights Applications -15-Mile Reach and Yampa - Status Report <br />Tape 5 Start/Stop, 1566 - 1688 <br />Action, This was an informational item; no action taken, <br /> <br />211. Colorado River Basin Issues - Ruedi Reservoir - Proposed contract for releases of <br />21,650 AF to endangered fish in the 15-Mile Reach <br />Tape 5, Start/Stop, 1688 - 1924 <br />Action, A motion was made by David Smith to accept the staffrecommendation to <br />proceed with the contract for one more year, for 21,650 AF, and with the <br />following amendments, 1) in Item I, a paragraph be added defining <br />regulatory storage; 2) in 3A, the Article 8 reference, remove "8" and make it <br />"Article 1"; 3) in 3B, add a phrase that says "and in compliance with the <br />Fryingpan Arkansas Project Operating Principles", The motion was <br />seconded by Eric Kuhn and approved unanimously (8-0), <br /> <br />Minutes March 29-30, 1999 <br />Page 13 <br />