My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02316
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:34 PM
Creation date
10/4/2006 7:13:57 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/24/2006
Description
CF Section - Changes to Existing Loans - Mancos Valley Beaver Ditch Company - Beaver Ditch Pipeline Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />. <br /> <br />- <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866.4474 <br />www.cwcb.state.cQ.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br />,//"~ <br />Kirk Russell, P.E. ~ ~f' r <br />Mike Serlet, P.E., Chief '-~J <br />Water Supply Planning an Finance Section <br /> <br />Russell George <br />Executive Director <br /> <br />FROM: <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Rick Brown <br />Acting Deputy <br />Director <br /> <br />DATE: January 17, 2006 <br /> <br />SUBJECT: Agenda Item 19a, January 24-25,2006 Board Meeting <br />Water Supply Planning and Finance Section - Change to Existing Loan <br />Mancos Valley Beaver Ditch Company - Ditch Pipeline Project <br /> <br />The Mancos Valley Beaver Ditch Company (Company) is requesting an increase to CWCS's funding <br />limit of CWCS Loan (Contract #C150185). This requested increase is from $413.000 (approved <br />September 14, 2004) to $904,750 (100% of current Project cost estimate per CWCB Policy). This <br />increase is a result of an error in the original Project scope. The Project length and alignment will <br />remain nearly the same as the previously approved loan; however, the pipe size has been increased. <br />The Company will receive in-kind engineering services and a grant from NRCS for 75 percent of the <br />NRCS established unit prices. The remaining 25 percent of the construction cost will become a 30-year <br />CWCS loan. <br /> <br />Financial Analvsis <br /> <br />Table 1 shows a summary of the funding sources for the project. The Company will receive a 75 <br />percent construction grant from NRCS totaling $678,562. <br /> <br />Table 1. Project Funding Sources <br /> <br />Entity <br /> <br />Initial <br />Loan <br /> <br />Grant <br /> <br />Post-Construction <br />Loan <br /> <br />CWCS $904,750 $0 $226,188 <br />NRCS $0 $678,562* $0 <br />Company $0 $0 $0 <br />Totals $904,750 $678,562 $226,188 <br />* Received after construction is complete from NRCS Salinity Control Project. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.