Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Page 2 <br />DecembCl' 12. 2000 <br /> <br />Dates that Bear Creek abo\'e Evergreen was below S cis <br /> <br />313 <br /> <br />MONTH <br />YEAR October Novembor Decomber January February March <br />ffi4 <br />19B5 <br />/986 <br />1981 <br />1911 <br />1919 <br />1990 <br />1991 <br />1992 <br />1991 <br />1994 <br />199$ <br />1996 <br />1997 <br />1991 <br />1999 <br />2000 <br /> <br /> PERCENT <br /> TOTAL DAYS OJl'TOTAL <br />April <lOeps bAYS <br /> 0 O.OO~ <br /> 0 0.00% <br /> 0 0.0096 <br /> 0 0,00% <br /> 0 0,00% <br /> 0 0,00" <br /> 0 0.0096 <br /> 0 0.00% <br /> 0 o.OO~ <br /> 0 0.00% <br /> 0 0.00% <br /> 0 0,00% <br /> 0 0.00% <br /> 0 0.00% <br /> 0 0.00% <br /> 0 O.OOM. <br /> 0 0.00% <br /> 6.205 <br /> <br />Number of days durillB period for Which stream gage fecol'lls are available: <br /> <br />NWllbe1' of days dwing pCliod 8I1Illyzcd that the proposed instealll flow was 1101 satisfied: <br /> <br />Percentage ofume flllll the proposed insteam flow ",a$1\I11)' satisfied: <br /> <br />8 <br /> <br />99,87% <br />