My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02304
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:26 PM
Creation date
10/4/2006 7:13:46 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/15/2005
Description
CF Section -De-Authorization Review - Poudre Tech Metropolitan District - Southwest/Southeast Lake Appurtenances
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-2- <br /> <br />, <br /> <br />Discussion <br /> <br />e <br /> <br />As of November of this year, there is one authorization for funding that is three years or more <br />past the date of authorization and is not yet under contract. There is also one project that is not past <br />the three-year deadline, however the project sponsors are no longer interested in moving forward <br />with a loan from the CWCB. Staffhas evaluated each of the authorizations and discussed the status of <br />the projects with the project sponsors and their consultants. The results of these evaluations along with <br />the staff recommendations relative to extending project time limits are summarized in the following: <br /> <br />a. Poudre Tech Metropolitan District - Dual Water Svstem and Reservoir Construction - The <br />CWCB approved a Construction Fund project loan of $2,180,000 to the District in 2002 for <br />the construction of a dual water system for outside irrigation within the Water Valley and <br />Hilltop subdivisions in the Town of Windsor. Due to unresolved collateral issues the <br />District has elected not to pursue the loan. The District has not specifically requested de- <br />authorization of this loan, however, upon further discussions with the District regarding <br />additional loan funds (attached letter) they verbally indicated that they were no longer <br />interested in the loan. Staff recommends that the Board consider de-authorization of this <br />loan. <br /> <br />b. National Oceanic and Atmospheric Administration - Revisions to the NOAA Atlas - The <br />CWCB approved a Construction Fund project non-reimbursable investment of $100,000 _ <br />to NOAA in 1997 to collaborate with the NOAA Colorado Basin River Forecast Center . <br />(CBRFC) on a project to improve spring streamflow forecast in westem Colorado. This <br />effort was part of a larger, federally-funded research project. The CWCB funding was <br />split over two years. A purchase order was executed for the first year and the first tasks <br />were completed. In the second year NOAA legal counsel did not accept the terms and <br />conditions of the state purchase order and requested a contract. Several months of <br />discussion indicated no agreement would occur on terms and conditions for a contract. <br />NOAA CDC then elected to complete the tasks without the 2nd_year funding from the <br />CWCB. This research project is ongoing and continues to receive federal funding. No <br />further funding is expected from the CWCB due to the contracting difficulties. $51,602 <br />remain in the project account that needs to be de-authorized. Staff recommends that the <br />Board consider de-authorization ofthe remaining project funds. <br /> <br />Recommendation <br /> <br />Staff recommends the Board approve de-authorization of the loan authorization and non- <br />reimbursable investment as described above. <br /> <br />e <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.