Laserfiche WebLink
<br />. <br /> <br />e 1 COMMENTS RECEIVED, HAS DETERMINED THAT THE OPERATION AND <br /> 2 ADMINISTRATION OF THE PROPOSED LOAN WILL NOT CAUSE MATERIAL <br /> 3 INJURY TO OTHER WATER RIGHTS OR IMPACT COLORADO'S COMPACT <br /> 4 ENTITLEMENTS. THE DIVISION ENGINEER SHALL IMPOSE SUCH TERMS AND <br /> 5 CONDITIONS AS ARE NECESSARY TO ENSURE THAT THESE STANDARDS ARE <br /> 6 MET. IN MAKING THE DETERMINATIONS SPECIFIED IN THISSUBP ARAGRAPH <br /> 7 (VI), THE DIVISION ENGINEER SHALL NOT BE REQUIRED TO HOLD ANY <br /> 8 FORMAL HEARINGS OR CONDUCT ANY OTHER FORMAL PROCEEDINGS, BUT <br /> 9 MAY CONDUCT A HEARING OR FORMAL PROCEEDING IF THE DMSION <br /> 10 ENGINEER FINDS IT NECESSARY TO ADDRESS THE ISSUES. <br /> 11 (VII) THE DIVISION ENGINEER, SHALL APPROVE OR DENY THE <br /> 12 PROPOSED LOAN WITHIN TWENTY DAYS AFTER THE DATE OFMNLING OF <br /> 13 NOTICE UNDER SUBPARAGRAPH (n) OF THIS PARAGRAPH (b), OR WITHIN <br />e 14 FIVE DAYS AFTER THE APPLICANT PROVIDES EVIDENCE THAT ALL PERSONS <br />15 ENTITLED TO NOTICE OF THE APPLICATION UNDER SUBPARAGRAPH (II) OF <br /> 16 THIS PARAGRAPH (b) HAVE EITHER CONSENTED TO OR COMMENTED ON THE <br /> 17 APPLICATION. <br /> 18 (Vill) WHEN THE DIVISION ENGINEER APPROVES OR DENIES A <br /> 19 PROPOSED LOAN, THE DIVISION ENGINEER SHALL SERVE A COpy OF THE <br /> 20 DECISION ON ALL PARTIES TO THE APPLICATION BY FIRST-CLASS MAIL OR, <br /> 21 IF SUCH PARTIES HAVE SO ELECTED, BY ELECTRONIC MAIL. NEITHER THE <br /> 22 APPROVAL NOR THE DENIAL BY THE DMSION ENGINEER SHALL CREATE <br /> 23 ANY PRESUMPTIONS, SHIFTTHEBURDEN OFPROOF, OR SERVE AS ADEFENSE <br /> 24 IN ANY LEGAL ACTION THAT MAY BE INITIATED CONCERNING THE LOAN. <br /> 25 ANY APPEAL OF A DECISION BY THE DIVISION ENGINEER CONCERNING THE <br /> 26 LOAN PURSUANT TO THIS SECTION SHALL BE MADE TO THE WATER JUDGE <br /> 27 IN THE APPLICABLE WATER DIVISION WITHIN FIFTEEN DAYS AFTER THE <br />e <br /> -5- 1320 <br />