Laserfiche WebLink
<br />was made by David Smith to advance the recommendations made in the <br />Preliminary Notice to a Final Notice Status, with the condition that if there <br />are issues raised, it won't be brought directly to the Board in September, but <br />that some resolution will be sought before final action will be brought to the <br />Board. The motion was seconded by Eric Kuhn and approved unanimously <br />(9-0). <br /> <br />12. WQCC/WC/CWCB Workshop Follow-Up <br />Tape 3, Start/Stop: 1561 - 2615 <br />Action: A motion was made by Patricia Wells that the staff be requested that when the Board <br />is requested to take action on a specific grant or project, to have that <br />information or application provided to the Board reflect the local response <br />which might be reflected in a local plan. The motion was seconded by David <br />Smith and approved unanimously (10-0). <br /> <br />13a. 1996-1997 Colorado River System Reservoir Operations <br />Tape 3, Start/Stop: 2615 - 3700 <br />Action: Information item; no action taken. <br /> <br />13b. Glen Canyon BeachIHabitat Building Flow, April 1996 - Status Report <br />Tape 3, Start/Stop: 3700 - 3910 <br />Action: Information item; no action taken. <br /> <br />13c. Ute Water Conservancy District's Plateau Creek Pipeline Project - Status Report <br />Tape 3, Start/Stop: 3910 - 4170 <br />Action: Information item; no action taken. <br /> <br />13d. 15-Mile Reach Strategy <br />Tape 3, Start/Stop: <br />Action: Information item; no action taken. <br /> <br />4170 - 4400 <br /> <br />13e. Non Native Species Stocking <br />Tape I, Start/Stop: 1599 - 3493 <br />Tape 3, Start/Stop: 11 01 - 1455 <br />Action: A motion was made by Alan Hamel that the Board move the resolution as <br />distributed and amended with the addition of language regarding "self- <br />sustaining", approving the letter and the resolution. The motion was <br />seconded by Janice Sheftel and approved unanimously (10-0). <br /> <br />14a. Financial Activity in April and May 1996 <br />14b. Delinquent Payments <br />14d. Marketing Update on Future Prospects <br />14e. Contract Processing Status Report <br />14f. Reconnaissance and Feasibility Study Status Report <br /> <br />Minutes July 8-9,1996 CWCB Meeting <br />