My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02275
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:10 PM
Creation date
10/4/2006 7:13:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/20/2004
Description
WSP Section - Feasibility Study Status Report - La Plata Water Conservancy District - Long Hollow and Red Mesa Ward Reservoirs
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Reconnaissance-Level Opinion of Cost <br />Long Hollow Dam and Reservoir (5,400 AF) <br /> <br />'I;..dd .. d . <br />I <br />I <br />I <br />I <br />I <br />i <br /> <br />. Basis: Hepworth-Pawlak engineering geology, new <br />topography, Harris area-capacity table <br />. Statistics: 125 ft dam height <br />15 ft freeboa rd <br />850 ft crest height <br />spillway: 150 ft wide and 1,500 ft long <br />. Opinion of Cost: $15.8 MM + 3.9 MM (contingency) <br />= $19.7 MM (+/-500/0) <br />~ 660/0 of capital cost and 550/0 of total cost <br />related to rate and volume of design inflow flood <br /> <br />DRAFT <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.