My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02273
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:08 PM
Creation date
10/4/2006 7:13:15 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/11/1998
Description
ISF Section - Informational Items - Summary of Resolved Cases
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />Agenda Item 12a(2) <br />Case No. 5-91CW263; Gateway ofSnowmass Mesa <br /> <br />Case Summary <br /> <br />The Board ratified the Statement of Opposition filed in this case at its November 25-26, 1996, <br />meeting. This is a second amended application for approval of plan for augmentation and <br />appropriative right of exchange on Capitol Creek, Snowmass Creek, and the Roaring Fork River <br />near Snowmass in Pitkin County (see attached map). Applicant proposes to augment its out-of- <br />priority depletions with releases of water from either Ruedi Reservoir or several on-site ponds. <br /> <br />The Board holds the following instream flow decrees on Capitol Creek, Snowmass Creek, and <br />the Roaring Fork River. <br /> <br />Case No. <br /> <br />Stream <br /> <br />Amount (cfs) <br /> <br />Aooroo. Date <br /> <br />85CW646 <br />76W2943 <br />76W294I <br /> <br />Roaring Fork River <br />Snowmass Creek <br />Capitol Creek <br /> <br />55/30 <br />12 <br />IO <br /> <br />I 1/08/85 <br />1/14/76 <br />1/14/76 <br /> <br />StiouIation <br /> <br />Applicants have agreed to the following terms and conditions which will provide full protection <br />for the Board's instream flow water rights on the Roaring Fork River, Snowmass Creek, and <br />Capitol Creek. <br /> <br />. Applicant agrees to either: <br />1) curtail its out-of-priority depletions under this plan for augmentation, or <br />2) replace said out-of-priority depletions at or upstream of its diversion structure at <br />anytime the streamflow Snowmass Creek immediately below applicant's <br />diversion structure is less than 12 cfs, the amount of the Board's instream flow <br />water right. <br /> <br />. Applicant agrees to curtail its April 10, 1992, upstream exchange from storage in Ruedi <br />Reservoir to storage in its augmentation ponds located on Capitol Creek or Snowmass <br />Creek at times when the streamflow in Capitol Creek is less than 10 cfs or the streamflow <br />in Snowmass Creek is less than 12 cfs immediately below the points of diversion into <br />said ponds. <br /> <br />. Pursuant to C.R.S. g37-92-502(5), Applicant shall instaII, maintain and monitor at <br />locations determined by the Division Engineer, and at Applicant's expense, such <br />measuring devices deemed necessary by the Division Engineer to administer the terms of <br />this decree. <br /> <br />A:\591CW263.STP <br />
The URL can be used to link to this page
Your browser does not support the video tag.