My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 01/06/1983
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
Board Meeting 01/06/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:07 PM
Creation date
10/4/2006 7:13:12 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/6/1983
Description
CWCB Meeting - No mins.
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPLICATION FOR FEASIBILITY STUDY <br />ORCHARD CITY IRRIGATION DISTRICT <br /> <br />JANUARY 6, 1983 <br /> <br />Introduction <br /> <br />The Orchard City Irrigation District is the owner of the <br />Fruitgrowers Reservoir, which is located in the Harts Basin about <br />a mile away from Eckert and Orcharo City. Fruitgrowers is an <br />offstream reservoir, which is filled from water in Surface Creek <br />by way of Alfalfa Ditch and from water in Dry Creek by way of the <br />Dry Creek Transfer Ditch. <br /> <br />Project <br /> <br />The present reservoir has a storage capacity of 4,400 acre <br />feet of water. Sy increasing the height of the dam by about four <br />feet, the District's consulting engineer has determined that an <br />additional 1,500 acre feet of storage could be gained. A new <br />spillway would also have to be constructed. The project would <br />help the irrigators of the District, who now have to pump water <br />from the Gunnison River, by allowing them to irrigate by <br />gravity. <br /> <br />A prp-liminary cost estimate of construction is about $3 <br />million. It is anticipated that matching funds for the construc- <br />tion of the project could become available from the Federal <br />government through the U. S. Bureau of Reclamation. The antici- <br />pated cost share would be fifty-fifty. <br /> <br />Discussion <br /> <br />Subsequent to recelvlng the District's application for assis- <br />tance, the staff has conducted a field investigation of the <br />existing project. Also, additional data concerning the project, <br />including present water rights, were reviewed. <br /> <br />It is concluded that the proposed enlargement of the embank- <br />ment and the new spillway are covered by 37-60-121(1)(b)(1), <br />Colorado Revised Statutes 1973, as amended, which pertains to <br />construction of projects, "which will increase the beneficial <br />consumptive use of Colorado's Compact entitled waters." <br /> <br />The requested feasibility study will cost not more than an <br />estimated $7,000. The District is asking for Board funds for 50 <br />percent of the cost, i.e., $3,500. It is expected that the <br />feasibility study will identify in detail the construction <br />requirements and costs of the proposed project. <br /> <br />FHMP <br />orch/city <br />
The URL can be used to link to this page
Your browser does not support the video tag.