My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 01/06/1983
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
Board Meeting 01/06/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:07 PM
Creation date
10/4/2006 7:13:12 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/6/1983
Description
CWCB Meeting - No mins.
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- ~- <br /> <br />COLORADO WATER CONSERVATION BOARD <br />823 State Centennial Building <br />1313 Sh~rman Street <br />Denver, C~lorado 80203 <br /> <br />January 6-7, 1983 <br /> <br />Harper Lake' Reservoir <br />(City o~.Louisvil1el <br /> <br />Introduction <br /> <br />Harpe~ Lake Reservoir is l~cated on Davidson Mesa approxi- <br />mately one mile west of Louisville. This reservoir is decreed <br />for agricultural use in the am~unt 62 acre-feet. It would be <br />enlarged to 715 acre-feet and ~ou1d serve as a raw water storage <br />facility for the city of Louisville. The city has applied for a <br />change of use to municipal water on the 62 acre-feet (case <br />82CW376l. The city currently ~wns over 2,200 acre-feet of direct <br />flow rights, the point of dive~sion and the use of which would be <br />changed in order to utilize the expanded reservoir. <br /> <br />Problem <br /> <br />The City of Louisville has experienced more than a 200 per- <br />cent population increase durinq the last decade. Due to this the <br />city's winter water supply is being taxed to the limit. With <br />continued growth in the area, the town will need to expand its <br />raw water storage capacity. The proposed project would satisfy <br />that need to the year 2010. <br /> <br />Project Study <br /> <br />In January, 1981, the City of Louisville submitted an appli- <br />cation for State financial assistance. The Board later approved <br />funding for half of the cost of a feasibility study on the pro- <br />posed project. That study has now been completed by Rocky <br />Mountain Consultants, Inc., and is the basis of recommendations <br />on this project. <br /> <br />proposed Project <br /> <br />Five alternative projects were studied for the city. For <br />reasons of economics and ease of construction, the Harper Lake <br />Reservoir alternative was dete~mined to be the most feasible. <br />This project would increase the existing Harper Lake Reservoir <br />from a 62 to a 715 acre-foot capacity. The new reservoir would <br />have a_maximum depth of 23 feet, including 5 feet of freeboard, <br />and a surface area of 42 acres. A pumping station would be <br />installed to pump water from this reservoir to the Louisville <br />Ditch, which would transport water to the city's other raw water <br />reservoir. <br /> <br />600 <br />Harper/Lake <br />
The URL can be used to link to this page
Your browser does not support the video tag.