My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 01/06/1983
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
Board Meeting 01/06/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:07 PM
Creation date
10/4/2006 7:13:12 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/6/1983
Description
CWCB Meeting - No mins.
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.- <br /> <br />COLORADO WATER CONSERVATION BOARD <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />January 6-7, 1983 <br /> <br />Fuchs Dam Rehabilitation project <br />(Fuchs Ranches, Inc.) <br /> <br />Introduction <br /> <br />Fuchs Dam is located about 17 miles southwest of Del <br />Norte, Colorado. The dam and reservoir both lie within the <br />Rio Grande National Forest. The project was originally built <br />in 1930 with a dam height of 18 feet and a reservoir storage <br />capacity of 110 acre-feet. In 1938 the dam height was in- <br />creased to 21 feet which increased the reservoir storage to <br />153 acre-feet. A final enlargement occurred in 1943 to <br />increase the storage capacity to 241 acre-feet. The stored <br />water is used to provide late season water for Fuchs Ranches, <br />Inc. <br /> <br />Problem <br /> <br />The emergency spillway ~or the dam is located in the <br />left abutment. It is a wooden structure which uses flash- <br />boards to control the depth of water in the reservoir. Over <br />the years severe erosion has occurred in the spillway channel <br />below the dam, This channel lies along the toe of a steep <br />hillside and slides have occurred on the hillside above the <br />channel. A U.S. Forest Service road passes through this <br />slide area, That agency and the State Engineer's Office have <br />asked the reservoir owners to correct the erosion problem. <br /> <br />project Study <br /> <br />In October, 1980, Fuchs Ranches, Inc., applied to the <br />CWCB for financial assistance to correct the spillway channel <br />erosion problem. At the December, 1980, Board meeting a <br />feasibility study for the project was authorized. That study <br />has now been completed by HYQro-Triad, Ltd., and is the basis <br />of the recommendation for this project, <br /> <br />400 <br />f-6 <br /> <br />-,>. ----'-->..-._--<- . '- <br />
The URL can be used to link to this page
Your browser does not support the video tag.