Laserfiche WebLink
<br />"TUU"T <br /> <br />I will continue. It is evident without <br />going into details that the elimination of <br />Riverside 4,000 acres, Empire 3,000 acres, <br />Bijou No.2, 1000 acres - 8,000 acres with <br />the 8 miles of dikes, 40 miles of canals and <br />a minimum pool of 2,000 acres cannot fail to I <br />cut down on evaporation losses, to this Jack- <br />son also can be added if a complete cutoff is <br />made. This they admit to the extent of 11,000 <br />acre-feet in some of the tabulations; to <br />13,000 acre-feet in ,another without the incor- <br />poration of Jackson Lake. This water must be <br />worth something. At $50 per acre-foot which <br />was testified to at the Lower South platte <br />Conservancy District hearing, it would amount <br />to $550,000 annually, in 50 years $27,500,000. <br /> <br />In terms of land, the Narrows requires, <br />the taking of over 9,000 acres for reservoir <br />and in terms of irrigated farmland, irrigated <br />and sub-irrigated meadows as compared to 6,395 <br />acres for Weld County. This is taken from <br />the Justin Haynes report. In round numbers <br />almost 3,000 acres less of productive lands. <br />In terms of parcels, 428 acres for Narrows, <br />124 for Weld County. In terms of homes, 172 <br />for Narrows, 38 for Weld County. In terms <br />of lost annual production, at least $2 million <br />more for Narrows than for Weld County. In <br />fifty years, $100 million. <br /> <br />Let us now examine the relative efficien- <br />cies of the reservoirs. Weld County is to <br />have a complete cutoff because the Bureau <br />feels a safe dam cannot be built without a <br />complete cutoff. The same water, the same <br />type of material, however, at Narrows will <br />not require a cutoff on the right abutment <br />since it is stacked a little differently and <br />is more desirable like a pretty girl or as is <br />the case here, the first love of the Bureau. <br />In any event the seepage is estimated at over <br />40 cubic feet per second. This is being waived <br />off as being insignificant. That water will <br />have to be passed anyway. As pointed out be- <br />fore, the only time water can be passed is <br /> <br />. <br /> <br />I <br />