My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02195
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:13:21 PM
Creation date
10/4/2006 7:12:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/12/1964
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />not supply enough water at the time of need, <br />some because of loss of decrees, some to oper- <br />ate sprinklers, some for additional land and <br />some because it is more economical to pump <br />than to maintain ditches. The result has been <br />that tOday it can almost be said that the <br />ditches are supplemental to the pumps instead <br />of the pumps being supplemental to the ditches. <br />I have seen in the Brush area two good small <br />ditch systems completely dry up. The land <br />being served by them, however, is producing <br />better crops than ever before with wells. <br />Practically all of the land served by ditches <br />in the main valley of the South platte would <br />still produce with wells with the exception <br />of Riverside. North Sterling and a few other <br />isolated cases, because of the lack of aquifer <br />if the river was completely dry for a period <br />of time. <br /> <br />Each well pumped is constructing a reser- <br />voir equal in size to the water withdrawn less <br />the recirculation in acre-feet that will be <br />refilled from the first excess river flows. <br />Taken as a group the wells are creating a <br />reservoir equivalent to the sum total of the <br />consumptive use extracted therefrom and no <br />excess flow will pass down the river until <br />this reservoir is refilled. <br /> <br />Reservoir building of this nature started <br />with the first pump and well in the rechargeable <br />area of the South Platte River and has been <br />continuing at a faster and faster rate. This <br />year the additional wells will probably be <br />measured in the 100's, some small and some <br />that eventually will require 1000 acre-feet <br />of recharge storage each. <br /> <br />I <br /> <br />Also, the future river flows due to floods <br />will be less because of soil conservation <br />activities, terracing, stock dams, enlargements <br />to present reservoirs - in the Denver area, <br />Stanley Reservoir is now being enlarged and <br />there are other places as well - than was the <br />case 20 to 50 years ago. It is significant <br />
The URL can be used to link to this page
Your browser does not support the video tag.