Laserfiche WebLink
<br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1 313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866.4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />Roy Romer <br />Governor <br /> <br />James 5. Lochhead <br />Executive Director, DNR <br /> <br />OariesC. Lile,P.E. <br />Director, eweB <br /> <br />Peter H. Evans <br />Acting Director, eweB <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />~. <br /> <br />William P. Stanton, P.E., Chief, Project Planning and Construction Section <br /> <br />DATE: <br /> <br />November 17, 1998 <br /> <br />. <br /> <br />SUBJECT: Agenda Item 14a, November 23-24, 1998 Board Meeting - <br />Water Project Construction Loan Program - Revisions to Lending Policy <br /> <br />Introduction <br /> <br />This memo consolidates past revisions to the rate setting aspect of the Board's Lending Policies <br />as described in Section 1.3.2 of the Board's Guidelines for Financial Assistance through the <br />Colorado Water Conservation Board Construction Fund, dated August 1994. <br /> <br />Background <br /> <br />Beginning with the November 1994 meeting, the Board has been using a standard interest rate <br />structure based on the type of project (agricultural, municipal, and commercial) and median <br />household income for municipal projects. This change in policy was documented in a memo to <br />the Board dated January 9, 1995. The standard lending rate for projects recommended to the <br />General Assembly has been based on this structure and determined annually at the November <br />meeting. <br /> <br />At the November 1997 meeting, the Board adopted further revisions to the lending policies and <br />. procedures as documented in a Board memo dated November 14, 1997. <br /> <br />1 <br />