Laserfiche WebLink
<br /> 5. Power Contracts CRSP power contracts No discretion on <br /> are not "unit specific" following <br /> but apply to integrated contracts; <br /> power facilities. however, <br /> flexibility within <br /> contracts to <br /> address changing <br /> hydrologic <br /> conditions and <br /> compliance with <br /> other laws. <br /> S8IN:Fa@t8 <br /> 6. Meet power NERC and WECC No <br /> system requirements reliability requirements <br /> (i.e. reserve voltage <br /> control, etc.) <br />L Dallas 1. Offset impacts of Opinions call for No <br />Creek and the depletions from upstream Reclamation <br />Dolores the Dallas Creek and reservoir to offset the <br />Project Dolores Projects on impacts <br />Biological endangered fish <br />Opinions , <br /> <br />ASPINALL UNIT HYDRAULIC CAPACITIES-no discretion <br /> <br />Blue Mesa <br />Morrow Point <br />Crystal <br /> <br />Powerplant (cfs) <br />3,400 <br />5,000 <br />2,150 <br /> <br />Outlet Works (cfs) <br />5,000 <br />1,500 <br />2,200 <br /> <br />Spillway (cfs) <br />34,000 <br />41,000 <br />41,350 <br /> <br />Total (cfs) <br />40,100* <br />47,500 <br />45,800 <br /> <br />* Blue Mesa Reservoir shares one penstock for both river outlet and powerplant releases. <br />The total combined releases of these two are constrained to about 6,100 cfs. <br /> <br />NOTES: <br /> <br />L The above hydraulic capacities assume maximum reservoir conditions, At lower <br />elevations, the hydraulic capacity would be less, Also, system efficiencies may affect the <br />hydraulic capacity. <br /> <br />2, Full flow capacity may not always be available due to scheduled maintenance or <br />equipment malfunction. <br /> <br />16 <br /> <br />" <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br />