Laserfiche WebLink
<br />B. Morrow L Tourboat Morrow Point Standing Yes <br />Point Dam operations: ~ Operating Procedure, <br /> I€lS3p.TBir is attfn1f1t@8 These elevations are not <br /> tsllo hold Attempt a strict rule and may be <br /> to hold reservoir periodically modified to <br /> between 7151.0 and address other needs. <br /> 7158.5 feet during the <br /> recreation season <br /> (May I-SeptemberI5) <br /> when the tour boat is <br /> in operation. When <br /> the tour boat is not in <br /> operation (September <br /> 15-April), the <br /> minimum reservoir <br /> elevation is 7144.0 <br /> 2, Drawdown Morrow Point Standing No-However, <br /> restrictions: To Operating Procedure geological <br /> minimize the risk of observations may <br /> movement of allow <br /> landslides within the modifications in <br /> reservoir, the reservoir any particular <br /> draw down rate is year. <br /> limited to a maximum <br /> of 3 feet per day at <br /> reservoir elevations <br /> below 7144 feet. For <br /> reservoir elevations <br /> above 7144, if the <br /> reservoir drawdown <br /> rate is expected to be <br /> greater than 3 feet per <br /> day, then visual <br /> observations should <br /> be made oflandslide <br /> A. <br /> 3. Peaking Curecanti Unit, Yes <br /> operations: Flows Economic Justification <br /> have historically Report, April 1962 <br /> fluctuated between 0 <br /> cfs and full <br /> powerplant capacity <br /> to meet variations in <br /> load requirements <br /> <br />12 <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br />