My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02143
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:49 PM
Creation date
10/4/2006 7:11:40 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/8/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:>q..J/ <br /> <br />I <br /> <br />presently being stored. The reservoir now <br />contains about 370,000 acre-feet of water. <br />Work proceeds on completion of the power- <br />plant and installation of the generators. <br />Both of these generators are expected to be <br />operating this spring. <br /> <br />At Morrow point Dam, this structure has <br />recently received mention by the National <br />Society of professional Engineers in its <br />selection of outstanding engineering achieve- <br />ments in 1966. It was pointed out that this <br />double curvature dam and the underground <br />powerplant was the first of this type of <br />structures built in the united States. <br /> <br />The contractor at Morrow Point Dam and <br />powerplant has completed about 78 percent of <br />his work. Mass concrete placements in Morrow <br />Point Dam, discontinued last October, will be <br />resumed as soon as the weather permits. It <br />is expected that the dam will be topped out <br />this summer. other work at Morrow Point has <br />continued through the winter. The contractor <br />has completed excavation of the stilling <br />basin area downstream from the dam and is now <br />making concrete placements in this area. In <br />the underground powerplant the contractor has <br />made the final placement of concrete and has <br />started a general cleanup. We expect to <br />award the powerplant completion contract late <br />in 1967. The first generator at Morrow Point <br />should be operating in the spring of 1969 and <br />the second early that summer. <br /> <br />I <br /> <br />The third dam of the Curecanti unit, <br />crystal Dam and powerplant, we believe now, <br />under the present program, we will be able <br />to start this unit late in the fall of 1968. <br /> <br />On the Navajo Unit in New Mexico, repair <br />and modification of the outlet works stilling <br />basin is expected to get under way this fall. <br />The stilling basin will be unwatered this <br />spring by separate contract in order that <br />prospective bidders may inspect the work <br />
The URL can be used to link to this page
Your browser does not support the video tag.