Laserfiche WebLink
<br />" <br /> <br />Greeley end Loveland Irrigation Company <br />January 22.23. 2003 <br /> <br />Agenda Item 1 go <br /> <br />. <br /> <br />Wat~r Project Construction Loan program.project Data <br /> <br />Borrower: Greeley and Loveland Irrigation Co. County: Larimer <br /> <br />. Project Name: Boyd Lake Low-level Outlet Project Type: Rehabilitation/Replacement <br /> <br /> <br />Drainage Basin:' South Platte Water SOlArce: Big Thompson River <br /> <br />Total Project Cost: $1,345,000 FundlngSolArces: CWCB, GLlC <br /> <br /> <br />Type of Borrower: Agricultural/Municipal Aver. Delivery: 37,812 acre-feet <br /> <br />cweB Small Project Loan: $1,000,000 <br /> <br />Interest Rate: 3.25% <br /> <br />Term: 30 years <br /> <br />The Greeley and Loveland Irrigation Company (GLlC), and its sister company the Seven Lakes <br />Irrigation Company, own and operate an extensive system of reservoirs and canals in the Loveland <br />and Greeley area. GLlC owns Boyd Lake, the largElst reservoir in the GLlGsystem, with a surface <br />area of 1,750 acres and a capacity of 48,874 acre-feet. The GLlC is applying for a $1,000,000 <br />Small Project Loan from the Construction Fund to replace the existing low-level outlet works at the <br />Boyd Lake Dam, The existing outlet works is in poor structural condition, and deficiencies include <br />significant cracking, holes and leaks, and substantiai sediment accumulation. Downstream of the. <br />embankment the existing pipe is collapsing in some areas. The proposed low-level outlet works will <br />consist of 300 feet of 48" diameter concrete mortar-lined (CML) steel through the dam . <br />embankment, and will be controlled by a 48" sluice gate, located in a gate chamber. The 50 feet of <br />CML steel pipe leading. into the chamber will be enclilsed in concrete, and the remaining 250 feet of <br />CML steel pipe installed using microtunneling technology. Downstream of the embankment, the <br />steel pipe would transition Into.1600 feet of 48" reinforced concrete pipe (RCP), discharging into a <br />stilling basin 200 feet upstream of U.S. Highway 34.' <br /> <br /> <br />I <br />-_i <br />1'., <br />i <br />-....../. <br />~, <br />\ <br /> <br />l" <br /> <br />.. leer; <br />/' ; 0 <br />, / ~ ~ <br />'.f "RD <br />) <br />/"./ <br /> <br />EXIT <br />259 CROSSROADS BLVD <br /> <br />g. <br /> <br />Oklahom ~ <br />Re.serooJ .. . <br /> <br />. <br /> <br />Location!Map <br /> <br />Page 6 bf 6 <br />